United States › Power plants › Battery storage › Texas
BATTERY STORAGEResaca Oasis Storage
Resaca Oasis Storage is a 201 MW approved battery storage site in Cameron County, Texas, operated by Red River Clean Energy.
Plant statusConsented
- Planning (completed)
- Consented (current stage)
- Construction (not yet reached)
- OperatingTarget Sep 2028 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Sep 2028.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| RESBS | Batteries | 201 MW | Approved, construction not started |
Plant details
- Operator
- Red River Clean Energy
- Location
- Cameron County, Texas
- Balancing authority
- ERCO
- Sector
- IPP Non-CHP
- Capacity
- Approved: 201 MW
- EIA plant ID
- 69120
Location
25.9788, -97.3726
Nearby power plants
- WAL456Gas power plants · 1.2 MW · 9.1 mi
- Aggreko MSR Grid PC7Battery storage · 10.0 MW · 9.4 mi
- San Roman Wind I, LLCWind farms · 95.3 MW · 10.2 mi
- Hecate Grid East Valley StorageBattery storage · 255 MW · 10.3 mi
- Silas RayGas power plants, Oil-fired power plants · 143 MW · 10.3 mi
- SMT Los Fresnos LLCBattery storage · 10.0 MW · 11.5 mi
- Villa CavasosOil-fired power plants · 9.0 MW · 14.2 mi
- Regis LaurelesBattery storage · 9.9 MW · 14.7 mi
- Cameron Wind 1 LLCBattery storage, Wind farms · 181 MW · 16.0 mi
- La Chalupa, LLCWind farms · 199 MW · 20.6 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem