United States › Power plants › Battery storage › Texas
BATTERY STORAGEHecate Grid East Valley Storage
Hecate Grid East Valley Storage is a 255 MW planned battery storage site in Cameron County, Texas, operated by Hecate Grid East Valley Storage, LLC.
Plant statusIn planning
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2027 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Dec 2027.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| RMSY | Batteries | 255 MW | Planned, approvals not yet sought |
Plant details
- Operator
- Hecate Grid East Valley Storage, LLC
- Location
- Cameron County, Texas
- Balancing authority
- ERCO
- Sector
- IPP Non-CHP
- Capacity
- Planned: 255 MW
- EIA plant ID
- 66411
Location
25.9411, -97.5328
Nearby power plants
- Silas RayGas power plants, Oil-fired power plants · 143 MW · 2.1 mi
- WAL456Gas power plants · 1.2 MW · 2.6 mi
- Aggreko MSR Grid PC7Battery storage · 10.0 MW · 4.2 mi
- Villa CavasosOil-fired power plants · 9.0 MW · 6.8 mi
- SMT Los Fresnos LLCBattery storage · 10.0 MW · 9.2 mi
- Resaca Oasis StorageBattery storage · 201 MW · 10.3 mi
- Regis LaurelesBattery storage · 9.9 MW · 12.6 mi
- San Roman Wind I, LLCWind farms · 95.3 MW · 16.0 mi
- VaqueroOil-fired power plants · 9.0 MW · 17.4 mi
- Cameron Wind 1 LLCBattery storage, Wind farms · 181 MW · 18.0 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem