United States › Power plants › Battery storage › Texas
BATTERY STORAGECedar Hill ESS
Cedar Hill ESS is a 10.0 MW planned battery storage site in Dallas County, Texas, operated by Cedar Hill ESS Assets, LLC.
Plant statusIn planning
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jun 2030 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Jun 2030.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| 3004 | Batteries | 10 MW | Regulatory approvals pending |
Plant details
- Operator
- Cedar Hill ESS Assets, LLC
- Location
- Dallas County, Texas
- Balancing authority
- ERCO
- Sector
- IPP Non-CHP
- Capacity
- Planned: 10.0 MW
- EIA plant ID
- 67570
Location
32.6121, -96.9251
Nearby power plants
- WAL3285Gas power plants · 1.2 MW · 1.6 mi
- WAL3432Gas power plants · 1.2 MW · 3.0 mi
- Mountain CreekGas power plants · 852 MW · 7.7 mi
- WAL896Gas power plants · 1.2 MW · 7.7 mi
- TX Dallas 7750 Dynasty DriveSolar farms · 2.3 MW · 10.2 mi
- Century BESSBattery storage · 10.0 MW · 10.5 mi
- HEB00750Gas power plants · 1.2 MW · 11.5 mi
- WAL284Gas power plants · 1.2 MW · 12.2 mi
- Ellis Solar LLCSolar farms · 80.0 MW · 12.5 mi
- WAL1801Gas power plants · 1.2 MW · 12.6 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem