United States › Power plants › Battery storage › Texas
BATTERY STORAGENorth Pecos Clean Energy Center (BESS)
North Pecos Clean Energy Center (BESS) is a 10.1 MW operating battery storage site in Reeves County, Texas, operated by On Energy Storage. Its batteries store up to 20 MWh.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| NPBA1 | Batteries | 10 MW 20 MWh |
Plant details
- Operator
- On Energy Storage
- Location
- Reeves County, Texas
- Balancing authority
- ERCO
- Sector
- IPP Non-CHP
- Capacity
- Operating: 10.1 MW
- First unit online
- Feb 2026
- EIA plant ID
- 69458
Location
31.4225, -103.5091
Nearby power plants
- Elm Street BESSBattery storage · 9.9 MW · 0.7 mi
- County Road BESSBattery storage · 9.9 MW · 1.7 mi
- CPV Basin Ranch Energy CenterGas power plants · 1,445 MW · 5.9 mi
- Saddleback BESS2Other power plants, Battery storage · 19.8 MW · 6.2 mi
- Cedarville (TX)Battery storage · 9.9 MW · 7.2 mi
- Cedarvale GasGas power plants · 10.0 MW · 7.3 mi
- Coyote Springs (TX)Oil-fired power plants, Battery storage · 19.8 MW · 7.4 mi
- SandlakeBattery storage · 9.9 MW · 8.7 mi
- Swoose IIBattery storage · 101 MW · 8.9 mi
- TX8 WorshamBattery storage · 9.9 MW · 11.2 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem