United States βΊ Power plants βΊ Battery storage βΊ Oregon
OCTARY USA Β· BATTERY STORAGEBattery storage sites in Oregon
Grid-scale battery and other energy storage in the United States, with power (MW) and, where reported, energy (MWh). Click a state to drill down, or search near a place.
Operating6plants
Operating capacity523 MWnameplate
Under construction168 MW4 plants
Whole pipeline2,940 MWplanned, approved and building
Map
Loading plantsβ¦
OperatingUnder constructionApprovedPlannedRetiredCancelled
Plants
15 plants
| Plant | Capacity | Stage |
|---|---|---|
| Sunstone Solar | 1,200 MW | In planning |
| Deschutes Solar and BESS | 1,000 MW | In planning |
| Salmonfly Solar and Storage | 247 MW | In planning |
| Seaside BESS | 200 MW 800 MWh |
|
| Sundial (Troutdale) BESS | 200 MW 800 MWh |
|
| Tualatin Battery Energy Storage System | 200 MW | In planning |
| Biglow Solar Generation and BESS | 125 MW | In planning |
| Constable BESS | 75.0 MW 300 MWh |
|
| Wheatridge Optimization I | 65.0 MW | Under construction |
| Wheatridge Optimization II | 60.0 MW | Under construction |
| Shutler Energy Storage | 41.0 MW | Under construction |
| Wheatridge Hybrid | 30.0 MW 120 MWh |
|
| Coffee Creek BESS | 17.0 MW 34 MWh |
|
| OIT BESS | 2.0 MW | Under construction |
| Salem Henningsen | 1.0 MW 2 MWh |
Operating capacity by state
Click a state to drill down; click it again to go back to the whole country.
Largest owners and operators
By capacity in the current view. Click to see their plants.
- Sunstone Solar, LLC1 plants Β· 1,200 MW
- DECH bn, LLC1 plants Β· 1,000 MW
- Portland General Electric Co3 plants Β· 292 MW
- BrightNight Power1 plants Β· 247 MW
- TUAL bn, LLC1 plants Β· 200 MW
- Troutdale Grid, LLC1 plants Β· 200 MW
- BIGL bn, LLC1 plants Β· 125 MW
- Wheatridge Optimization I, LLC1 plants Β· 65.0 MW
- Wheatridge Optimization II, LLC1 plants Β· 60.0 MW
- Avangrid Power LLC1 plants Β· 41.0 MW
- Wheatridge Wind Holdings, LLC1 plants Β· 30.0 MW
- PacifiCorp1 plants Β· 2.0 MW
Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map