πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Power plants β€Ί Battery storage β€Ί Oregon

OCTARY USA Β· BATTERY STORAGE

Battery storage sites in Oregon

Grid-scale battery and other energy storage in the United States, with power (MW) and, where reported, energy (MWh). Click a state to drill down, or search near a place.

Operating6plants
Operating capacity523 MWnameplate
Under construction168 MW4 plants
Whole pipeline2,940 MWplanned, approved and building

Map

Loading plants…
OperatingUnder constructionApprovedPlannedRetiredCancelled

Plants

15 plants
PlantCapacityStageStateOwner / operatorYear
Sunstone Solar 1,200 MW In planning OR
Morrow
Sunstone Solar, LLC 2027
Deschutes Solar and BESS 1,000 MW In planning OR
Wasco
DECH bn, LLC 2029
Salmonfly Solar and Storage 247 MW In planning OR
Jefferson
BrightNight Power 2029
Seaside BESS 200 MW
800 MWh
Operating OR
Multnomah
Portland General Electric Co 2025
Sundial (Troutdale) BESS 200 MW
800 MWh
Operating OR
Multnomah
Troutdale Grid, LLC 2024
Tualatin Battery Energy Storage System 200 MW In planning OR
Washington
TUAL bn, LLC 2027
Biglow Solar Generation and BESS 125 MW In planning OR
Sherman
BIGL bn, LLC 2027
Constable BESS 75.0 MW
300 MWh
Operating OR
Washington
Portland General Electric Co 2024
Wheatridge Optimization I 65.0 MW Under construction OR
Morrow
Wheatridge Optimization I, LLC 2027
Wheatridge Optimization II 60.0 MW Under construction OR
Morrow
Wheatridge Optimization II, LLC 2027
Shutler Energy Storage 41.0 MW Under construction OR
Gilliam
Avangrid Power LLC 2028
Wheatridge Hybrid 30.0 MW
120 MWh
Operating OR
Morrow
Wheatridge Wind Holdings, LLC 2022
Coffee Creek BESS 17.0 MW
34 MWh
Operating OR
Washington
Portland General Electric Co 2024
OIT BESS 2.0 MW Under construction OR
Klamath
PacifiCorp 2027
Salem Henningsen 1.0 MW
2 MWh
Operating OR
Marion
Lineage Logistics Solar PV - Salem OR 2024

Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map