United States › Power plants › Solar farms › Oregon
SOLAR FARMS · BATTERY STORAGEWheatridge Optimization II
Wheatridge Optimization II is a 190 MW under construction solar and battery storage plant in Morrow County, Oregon, operated by Wheatridge Optimization II, LLC.
Plant statusUnder construction
- Planning (completed)
- Consented (completed)
- Construction (current stage)
- OperatingTarget Dec 2027 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Dec 2027.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| PV1 | Solar Photovoltaic | 130 MW | Under construction (up to 50%) |
| BA1 | Batteries | 60 MW | Under construction (up to 50%) |
Plant details
- Operator
- Wheatridge Optimization II, LLC
- Location
- Morrow County, Oregon
- Balancing authority
- BPAT
- Sector
- IPP Non-CHP
- Capacity
- Under construction: 190 MW
- EIA plant ID
- 70450
Location
45.5600, -119.6292
Nearby power plants
- Wheatridge HybridSolar farms, Battery storage, Wind farms · 280 MW · 0.2 mi
- Wheatridge 1Wind farms · 100 MW · 0.2 mi
- Wheatridge Optimization ISolar farms, Battery storage · 175 MW · 0.3 mi
- Sunstone SolarSolar farms, Battery storage · 2,400 MW · 4.5 mi
- Tutuilla SolarSolar farms · 1.6 MW · 5.6 mi
- Finley Buttes Landfill GasBioenergy plants · 4.8 MW · 9.0 mi
- Sand Ranch Windfarm LLCWind farms · 9.9 MW · 9.4 mi
- Pacific Canyon Windfarm LLCWind farms · 8.3 MW · 9.5 mi
- Wagon Trail LLCWind farms · 3.3 MW · 10.3 mi
- Big Top LLCWind farms · 1.7 MW · 10.3 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem