United States βΊ Power plants βΊ Battery storage βΊ Oregon
BATTERY STORAGE Β· SOLAR FARMSSunstone Solar
Sunstone Solar is a 2,400 MW planned power plant in Morrow County, Oregon, operated by Sunstone Solar, LLC.
Plant statusIn planning
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2027 (not yet reached)
- Closed (not yet reached)
Planned start of operation reported to EIA: Dec 2027.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| PGB45 | Batteries | 1,200 MW | Regulatory approvals pending |
| PGR45 | Solar Photovoltaic | 1,200 MW | Regulatory approvals pending |
Plant details
- Operator
- Sunstone Solar, LLC
- Location
- Morrow County, Oregon
- Balancing authority
- BPAT
- Sector
- IPP Non-CHP
- Capacity
- Planned: 2,400 MW
- EIA plant ID
- 68396
Location
45.6059, -119.5630
Nearby power plants
- Wheatridge Optimization ISolar farms, Battery storage Β· 175 MW Β· 4.3 mi
- Wheatridge Optimization IISolar farms, Battery storage Β· 190 MW Β· 4.5 mi
- Wheatridge HybridSolar farms, Battery storage, Wind farms Β· 280 MW Β· 4.7 mi
- Wheatridge 1Wind farms Β· 100 MW Β· 4.7 mi
- Sand Ranch Windfarm LLCWind farms Β· 9.9 MW Β· 5.0 mi
- Pacific Canyon Windfarm LLCWind farms Β· 8.3 MW Β· 5.0 mi
- Big Top LLCWind farms Β· 1.7 MW Β· 5.8 mi
- Wagon Trail LLCWind farms Β· 3.3 MW Β· 5.8 mi
- Four Mile Canyon Windfarm LLCWind farms Β· 10.0 MW Β· 5.9 mi
- Tutuilla SolarSolar farms Β· 1.6 MW Β· 6.2 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem