πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Power plants β€Ί Battery storage

OCTARY USA Β· BATTERY STORAGE

HEN Infrastructure, L.L.C.: battery storage sites in the USA

Grid-scale battery and other energy storage in the United States, with power (MW) and, where reported, energy (MWh). Click a state to drill down, or search near a place.

Operating31plants
Operating capacity307 MWnameplate
Under construction0.0 MW0 plants
Whole pipeline0.0 MWplanned, approved and building

Map

Loading plants…
OperatingUnder constructionApprovedPlannedRetiredCancelled

Plants

31 plants
PlantCapacityStageStateOwner / operatorYear
Toyah Power Station 10.4 MW
10 MWh
Operating TX
Reeves
HEN Infrastructure, L.L.C. 2021
Caterina 9.9 MW
10 MWh
Operating TX
Dimmit
HEN Infrastructure, L.L.C. 2022
Cedarville (TX) 9.9 MW
10 MWh
Operating TX
Reeves
HEN Infrastructure, L.L.C. 2022
CISCO BESS 9.9 MW
10 MWh
Operating TX
Eastland
HEN Infrastructure, L.L.C. 2024
Coyote Springs (TX) 9.9 MW
10 MWh
Operating TX
Reeves
HEN Infrastructure, L.L.C. 2022
Diboll BESS 9.9 MW
10 MWh
Operating TX
Angelina
HEN Infrastructure, L.L.C. 2024
Falfurrias BESS 9.9 MW
10 MWh
Operating TX
Brooks
HEN Infrastructure, L.L.C. 2024
Farmersville (TX) 9.9 MW
10 MWh
Operating TX
Collin
HEN Infrastructure, L.L.C. 2024
Faulkner 9.9 MW
10 MWh
Operating TX
Reeves
HEN Infrastructure, L.L.C. 2022
Garden City East BESS 9.9 MW
10 MWh
Operating TX
Glasscock
HEN Infrastructure, L.L.C. 2024
Gomez 9.9 MW
10 MWh
Operating TX
Pecos
HEN Infrastructure, L.L.C. 2023
Hamilton BESS 9.9 MW
10 MWh
Operating TX
Val Verde
HEN Infrastructure, L.L.C. 2024
Holcomb (TX) 9.9 MW
10 MWh
Operating TX
La Salle
HEN Infrastructure, L.L.C. 2023
Judkins BESS 9.9 MW
10 MWh
Operating TX
Ector
HEN Infrastructure, L.L.C. 2024
Junction (TX) 9.9 MW
10 MWh
Operating TX
Kimble
HEN Infrastructure, L.L.C. 2023
Lonestar 9.9 MW
10 MWh
Operating TX
Ward
HEN Infrastructure, L.L.C. 2022
Lufkin South BESS 9.9 MW
10 MWh
Operating TX
Angelina
HEN Infrastructure, L.L.C. 2024
Mainland 9.9 MW
10 MWh
Operating TX
Galveston
HEN Infrastructure, L.L.C. 2024
Mineral Wells East BESS 9.9 MW
10 MWh
Operating TX
Palo Pinto
HEN Infrastructure, L.L.C. 2024
Olney 9.9 MW
10 MWh
Operating TX
Young
HEN Infrastructure, L.L.C. 2023
Pauline BESS 9.9 MW
10 MWh
Operating TX
Henderson
HEN Infrastructure, L.L.C. 2024
Pavlov 9.9 MW
10 MWh
Operating TX
Matagorda
HEN Infrastructure, L.L.C. 2024
Poteet 9.9 MW
10 MWh
Operating TX
Atascosa
HEN Infrastructure, L.L.C. 2026
Rattlesnake (TX) 9.9 MW
10 MWh
Operating TX
Ward
HEN Infrastructure, L.L.C. 2022
Russek 9.9 MW
10 MWh
Operating TX
Reagan
HEN Infrastructure, L.L.C. 2025
Saddleback BESS2 9.9 MW
10 MWh
Operating TX
Reeves
HEN Infrastructure, L.L.C. 2022
Sandlake 9.9 MW
10 MWh
Operating TX
Reeves
HEN Infrastructure, L.L.C. 2024
Screwbean 9.9 MW
10 MWh
Operating TX
Culberson
HEN Infrastructure, L.L.C. 2023
Tynan 9.9 MW
10 MWh
Operating TX
Bee
HEN Infrastructure, L.L.C. 2025
Val Verde 9.9 MW
10 MWh
Operating TX
Hidalgo
HEN Infrastructure, L.L.C. 2024
Weil Tract BESS 9.9 MW
10 MWh
Operating TX
Nueces
HEN Infrastructure, L.L.C. 2024

Source: U.S. Energy Information Administration, Form EIA-860M, Monthly Update to the Annual Electric Generator Report, September 2026. Includes generators of 1 MW and over at plants connected to the grid. Planned dates are developers' targets reported to EIA and often move. US EV charging map