United States › Power plants › Battery storage › Texas
BATTERY STORAGEJudkins BESS
Judkins BESS is a 9.9 MW operating battery storage site in Ector County, Texas, operated by HEN Infrastructure, L.L.C.. Its batteries store up to 10 MWh.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| JUDKS | Batteries | 9.9 MW 10 MWh |
Plant details
- Operator
- HEN Infrastructure, L.L.C.
- Location
- Ector County, Texas
- Balancing authority
- ERCO
- Sector
- IPP Non-CHP
- Capacity
- Operating: 9.9 MW
- First unit online
- Mar 2024
- EIA plant ID
- 66790
Location
31.7156, -102.5981
Nearby power plants
- Swift Air Solar IISolar farms · 174 MW · 4.6 mi
- Swift Air Solar IIISolar farms · 100 MW · 4.6 mi
- Rockhound ASolar farms · 245 MW · 4.6 mi
- Rockhound CSolar farms · 61.0 MW · 4.6 mi
- Rockhound DSolar farms · 28.0 MW · 5.1 mi
- Oberon IBSolar farms · 30.0 MW · 6.1 mi
- Oberon IASolar farms · 150 MW · 6.1 mi
- Swift Air Solar ISolar farms · 145 MW · 6.8 mi
- Non-PLD US-El Paso - BSSAT004Battery storage · 9.9 MW · 11.5 mi
- WestoverOil-fired power plants · 9.0 MW · 12.2 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem