United States › Power plants › Battery storage › Texas
BATTERY STORAGENon-PLD US-El Paso - BSSAT004
Non-PLD US-El Paso - BSSAT004 is a 9.9 MW operating battery storage site in Ector County, Texas, operated by Prologis Logistics Services Incorporated BESS. Its batteries store up to 14 MWh.
Generators
Each generating unit EIA lists at this plant.
| Unit | Technology | Capacity | Status |
|---|---|---|---|
| BS004 | Batteries | 9.9 MW 14 MWh |
Plant details
- Operator
- Prologis Logistics Services Incorporated BESS
- Location
- Ector County, Texas
- Balancing authority
- ERCO
- Sector
- IPP Non-CHP
- Capacity
- Operating: 9.9 MW
- First unit online
- May 2025
- EIA plant ID
- 69576
Location
31.8404, -102.7264
Nearby power plants
- Swift Air Solar ISolar farms · 145 MW · 5.3 mi
- Phoebe SolarSolar farms · 250 MW · 8.3 mi
- Oberon IASolar farms · 150 MW · 9.6 mi
- Oberon IBSolar farms · 30.0 MW · 10.4 mi
- GoldsmithOil-fired power plants · 9.0 MW · 10.8 mi
- Judkins BESSBattery storage · 9.9 MW · 11.5 mi
- Notrees Windpower HybridBattery storage, Wind farms · 189 MW · 12.2 mi
- Oxy Renewable Energy - GoldsmithSolar farms · 16.8 MW · 12.4 mi
- Swift Air Solar IISolar farms · 174 MW · 14.6 mi
- Swift Air Solar IIISolar farms · 100 MW · 14.6 mi
Source: U.S. Energy Information Administration, Form EIA-860M, September 2026. Planned dates are targets reported by the developer and often change. Report a problem