🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Texas

OCTARY USA · INTERCONNECTION QUEUES

Queue requests in study in Texas (2024 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown37892.2 GW
Active in queue109.5 GW452 requests
Agreement signed17.3 GW74 requests
Withdrawn429,552 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

378 requests · page 1 of 8
ProjectCapacityStatusLocationRegionQueuedOnline
Aegle Power
Gas · Aegle Power LLC
1,536 MWIn study Cameron, TXERCOT Jul 2024target 2027
Sandow Lakes Energy Station
Gas · SL Energy Power Plant I, LLC
1,292 MWIn study Milam, TXERCOT Mar 2024target 2028
Corvette Wind
Onshore wind
1,200 MWPaused / redesign Carson, TXERCOT Feb 2024
Zeus Armstrong BESS
Solar + storage · Armstrong BESS, LLC
1,043 MWIn study Armstrong, TXERCOT Mar 2024target 2028
Zeus Mitchell BESS
Solar + storage · Mitchell BESS
1,043 MWIn study Mitchell, TXERCOT May 2024target 2029
EmberGreen
Gas · EmberGreen Energy Center
1,036 MWIn study Wharton, TXERCOT Jun 2024target 2028
Zeus Spade Wind
Wind + storage · Spade Wind, LLC
987 MWIn study Mitchell, TXERCOT Mar 2024target 2027
Fierce River Solar
Solar + storage · Rio Grande Solar LLC
896 MWIn study Starr, TXERCOT Mar 2024target 2029
West Royal Natural Gas (TEF-Due Diligence)
Gas · Invenergy Energy Transition Development LLC
888 MWIn study Upton, TXERCOT Jun 2024target 2030
Zeus Mitchell Solar
Solar + storage · Mitchell Solar, LLC
805 MWIn study Mitchell, TXERCOT Mar 2024target 2029
Indigo Solar 3
Solar · Indigo solar 3
800 MWIn study Fisher, TXERCOT Oct 2024target 2028
Axis Ridge Wind
Onshore wind · Axis Ridge Wind, LLC
750 MWIn study Sutton, TXERCOT Nov 2024target 2029
Central Power Station
Gas · Hydra-Gen Energy Unlimited
750 MWIn study Grimes, TXERCOT Mar 2024target 2027
Commodus Wind
Onshore wind · IP Blackwell, LLC
641 MWIn study Briscoe, TXERCOT Jul 2024target 2029
Cavell Wind
Onshore wind · IP Cavell, LLC
641 MWIn study Castro, TXERCOT Jul 2024target 2029
Comanche BESS
Battery storage · ENERGOS BESS
614 MWIn study Comanche, TXERCOT Dec 2024target 2028
Kingsmill Wind SLF
Onshore wind · Kingsmill Wind, LLC
606 MWIn study Carson, TXERCOT Jan 2024target 2029
Lavita BESS
Battery storage · Lavita BESS, LLC
606 MWIn study Bell, TXERCOT Dec 2024target 2028
Hobby BESS I
Battery storage · Airport Storage II LLC
603 MWIn study Harris, TXERCOT Sep 2024target 2027
Scorpius Solar
Solar · Ben Milam Solar 4
600 MWIn study Milam, TXERCOT Dec 2024target 2029
Sitges Wind
Onshore wind · NextEra Energy Interconnection Holdings, LLC
600 MWIn study Motley, TXERCOT Mar 2024target 2029
Proteus London-Leigh Solar SLF
Solar + storage · London Leigh Solar, LLC
600 MWIn study Glasscock, TXERCOT Mar 2024target 2028
Jenna Eco-Electric Solar
Solar · Clean Energy Holdings, LLC
576 MWIn study Fisher, TXERCOT May 2024target 2028
Toce TX BESS 2
Battery storage · TOCE TX BESS 2, LLC
523 MWIn study Wharton, TXERCOT Feb 2024target 2027
Tall Saddle Wind
Onshore wind · Tall Saddle Wind, LLC
523 MWIn study Kenedy, TXERCOT Jul 2024target 2029
Knight Airport BESS I
Battery storage · Airport Storage I LLC
523 MWIn study Harris, TXERCOT Aug 2024target 2027
Ochoa Energy Storage II
Battery storage · Ochoa Energy Storage II LLC
517 MWIn study Waller, TXERCOT Apr 2024target 2029
Catamount Storage
Battery storage · TOCE TX BESS 3, LLC
515 MWIn study Harris, TXERCOT Sep 2024target 2028
Diamante BESS
Battery storage · Flexen USA LLC
514 MWIn study Grimes, TXERCOT Feb 2024target 2028
Zeus Armstrong Solar
Solar + storage · Armstrong Solar, LLC
504 MWIn study Armstrong, TXERCOT May 2024target 2028
Muy Grande Solar
Solar · ACE DevCo NC, LLC
503 MWIn study Starr, TXERCOT Jan 2024target 2029
River Boat Solar
Solar + storage · Champion Creek Solar, LLC
502 MWIn study Mitchell, TXERCOT Sep 2024target 2028
Commodus Solar
Solar · IP Blackwell, LLC
502 MWIn study Briscoe, TXERCOT Jul 2024target 2029
Cavell Solar
Solar · IP Cavell, LLC
502 MWIn study Castro, TXERCOT Jul 2024target 2029
Millsing BESS
Battery storage · Millsing BESS
502 MWIn study Grimes, TXERCOT Feb 2024target 2028
North Royal Thermal (TEF- Due Diligence)
Gas · Invenergy Energy Transition Development LLC
479 MWIn study Lamar, TXERCOT Jun 2024target 2030
Mirando Valley Wind
Onshore wind · ACE DevCo NC LLC
479 MWIn study Jim Hogg, TXERCOT Aug 2024target 2028
Gregory Power Development SLF
Gas · Gregory Power Partners LLC
470 MWIn study San Patricio, TXERCOT Nov 2024target 2028
Cedar Draw Solar
Solar + storage · Cedar Draw Solar LLC
451 MWIn study Scurry, TXERCOT Mar 2024target 2027
Zeus Spade BESS
Wind + storage · Spade BESS
446 MWIn study Mitchell, TXERCOT Mar 2024target 2027
Windecker
Onshore wind · Windecker Energy LLC
420 MWIn study Upton, TXERCOT Mar 2024target 2028
Bypass BESS II
Battery storage · Bypass BESS II LLC
416 MWIn study Fort Bend, TXERCOT Nov 2024target 2027
Western Flats Storage
Solar + storage · Hecate Energy Point Mountain Solar Facility 1 LLC
411 MWIn study Crane, TXERCOT Apr 2024target 2028
Ulysses Crossing Solar
Solar
405 MWPaused / redesign Coleman, TXERCOT Sep 2024
Hittson Creek Solar
Solar + storage · 174 Power Global Properties
403 MWIn study Callahan, TXERCOT Dec 2024target 2028
Solarville Solar SLF
Solar + storage · Ville Solar, LLC
403 MWIn study Kaufman, TXERCOT May 2024target 2028
Bernice Energy Storage
Battery storage · Bernice Energy Storage LLC
403 MWIn study Bexar, TXERCOT Sep 2024target 2027
Bluefox Solar 1
Solar · Industrial November Project LLC
403 MWIn study Matagorda, TXERCOT Mar 2024target 2029
Bluefox Solar 2
Solar · Industrial November Project LLC
402 MWIn study Matagorda, TXERCOT Mar 2024target 2030
Infinium Solar
Solar · Jackalope Flats Solar, LLC
402 MWIn study Howard, TXERCOT Aug 2024target 2029
Page 1 of 8

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)