United States β€Ί Grid β€Ί Interconnection queues β€Ί Illinois

OCTARY USA Β· INTERCONNECTION QUEUES

Interconnection queue in Illinois (2020 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown365,601 MW
Active in queue5,601 MW36 requests
Agreement signed215 MW4 requests
Withdrawn579,515 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

36 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Gas project J1839, Macon County
Gas
340 MWIn study Macon, ILMISO Jun 2020target 2026
Pleasant Grove Solar
Solar Β· Deriva Energy Solar, LLC
300 MWIn study Mchenry, ILPJM Mar 2020target 2023
Solar project J1712, Perry County
Solar
300 MWIn study Perry, ILMISO Jun 2020target 2025
Dawson Solar
Solar Β· Deriva Energy Solar, LLC
300 MWIn study Mclean, ILPJM Sep 2020target 2024
Burr Oak Solar
Solar Β· Leeward Renewable Energy Development, LLC
300 MWIn study Dekalb, ILPJM Aug 2020target 2023
South Dixon Solar
Solar Β· Deriva Energy Solar, LLC
300 MWIn study Lee, ILPJM Mar 2020target 2022
Beacon Solar
Solar Β· Beacon Solar, LLC
260 MWIn study Rock Island, ILPJM Sep 2020target 2023
Gipper Solar Farm
Solar Β· Gipper Solar Farm, LLC
255 MWIn study Whiteside, ILPJM Oct 2020target 2023
Solar project J1840, Dewitt County
Solar
250 MWIn study Dewitt, ILMISO Jun 2020target 2023
Onshore wind project J1831, Menard County
Onshore wind
200 MWIn study Menard, ILMISO Jun 2020target 2026
Steward Creek Solar
Solar Β· Steward Creek Solar, LLC
200 MWIn study Lee, ILPJM Mar 2020target 2023
Riverbank Energy
Battery storage Β· Lincoln Reserve Energy, LLC
200 MWIn study Cook, ILPJM Mar 2020target 2024
Solar project J1677, Macon County
Solar
180 MWIn study Macon, ILMISO Jun 2020target 2026
Bright Stalk Generating Facility
Solar Β· Lexington Chenoa Wind Farm LLC
150 MWIn study Mclean, ILPJM Mar 2020target 2022
Solar project J1626, Fayette County
Solar
150 MWIn study Fayette, ILMISO Jun 2020target 2027
Osagrove Flats Solar
Solar Β· Aurora Solar LLC
150 MWIn study Lasalle, ILPJM Mar 2020target 2023
Otter Creek Solar
Solar Β· Aurora Solar LLC
150 MWIn study Lasalle, ILPJM Mar 2020target 2023
Solar project J1651, Logan County
Solar
150 MWIn study Logan, ILMISO Jun 2020target 2023
Onshore wind project J1755, Bureau County
Onshore wind
147 MWIn study Bureau, ILMISO Jun 2020target 2025
Kankakee Solar
Solar Β· AEUG Kankakee Solar, LLC
144 MWIn study Kankakee, ILPJM Feb 2020target 2021
Solar project J1679, Clay County
Solar
125 MWIn study Clay, ILMISO Jun 2020target 2026
Onshore wind project J1725, Tazewell County
Onshore wind
100 MWIn study Tazewell, ILMISO Jun 2020target 2027
Solar project J1610, Sangamon County
Solar
100 MWIn study Sangamon, ILMISO Jun 2020target 2026
Solar project J1777, Perry County
Solar
100 MWIn study Perry, ILMISO Jun 2020target 2026
Steward Creek Solar
Solar Β· Steward Creek Solar, LLC
100 MWIn study Lee, ILPJM Mar 2020target 2023
Solar project J1714, Fayette County
Solar
100 MWIn study Fayette, ILMISO Jun 2020target 2026
Grand Marsh Solar
Solar Β· Deriva Energy Solar, LLC
100 MWIn study Kankakee, ILPJM Mar 2020target 2023
Red Maple Solar
Solar Β· Red Maple Solar, LLC
95.1 MWIn study Dekalb, ILPJM Aug 2020target 2023
Red Maple Solar
Solar
94.9 MWAgreement signed Adams, ILPJM Mar 2020target 2028
Top Crop Generating Facility
Battery storage Β· Blackstone Wind Farm, LLC
50.0 MWIn study Lasalle, ILPJM Mar 2020target 2023
Twin Groves Storage II
Battery storage
50.0 MWAgreement signed Mclean, ILPJM Mar 2020target 2028
Twin Groves Storage I
Battery storage
50.0 MWAgreement signed Mclean, ILPJM Mar 2020target 2028
Top Crop Generating Facility
Battery storage Β· Blackstone Wind Farm, LLC
50.0 MWIn study Lasalle, ILPJM Mar 2020target 2023
Black Diamond Solar
Battery storage Β· Black Diamond Solar Power, LLC
30.0 MWIn study Christian, ILPJM Sep 2020target 2022
Wilmington Solar Energy Project
Solar + storage
19.9 MWAgreement signed Will, ILPJM Sep 2020target 2027
Aurora Battery Storage
Battery storage
10.0 MWPaused / redesign Will, ILPJM Oct 2020target 2028

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)