United States βΊ Grid βΊ Interconnection queues βΊ Florida
OCTARY USA Β· INTERCONNECTION QUEUESInterconnection queue in Florida (2025 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Gas project FC100382, Osceola County Gas Β· Duke Energy Florida, LLC |
265 MW | In study |
| Gas project FC100386, Osceola County Gas Β· Duke Energy Florida, LLC |
265 MW | In study |
| Battery storage project FC100380, Citrus County Battery storage Β· Duke Energy Florida, LLC |
199 MW | In study |
| Gas project 118, Polk County Gas |
132 MW | In study |
| Battery storage project FC100381, Leon County Battery storage Β· Duke Energy Florida, LLC |
100 MW | In study |
| Solar project FC100384, Suwannee County Solar Β· Duke Energy Florida, LLC |
74.9 MW | In study |
| Solar project FC100383, Liberty County Solar Β· Duke Energy Florida, LLC |
74.9 MW | In study |
| Solar project FC100385, Suwannee County Solar Β· Duke Energy Florida, LLC |
74.9 MW | In study |
| Solar project 121, Hillsborough County Solar |
74.5 MW | In study |
| Solar project 122, Hillsborough County Solar |
74.5 MW | In study |
| Battery storage project 120, Polk County Battery storage |
20.0 MW | In study |
| Solar project 123, Polk County Solar |
19.5 MW | In study |
| Gas project FC100379, Orange County Gas Β· Masked |
12.0 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)