BATTERY STORAGE · SOUTHEASTBattery storage project FC100381, Leon County
Battery storage project FC100381, Leon County is a 100 MW battery storage request in interconnection study in the Southeast interconnection queue, in Leon County, Florida, connecting to Duke Energy Florida.
- PlanningQueued Dec 2025 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Mar 2031 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- FC100381
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Florida
- Developer
- Duke Energy Florida, LLC
- Connection point (POI)
- Tallahassee 115 kV Substation
- Location
- Leon County, Florida
- Technology
- Battery: 100 MW
- Total requested
- 100 MW
- Service type
- NRIS and ERIS
- Study phase
- In Progress (unknown study)
- Queue status
- Active
- Entered queue
- 8 December 2025
- Proposed online date
- March 2031
Location
Marker shows the centre of Leon County; the queue data does not give exact sites.