United States βΊ Grid βΊ Interconnection queues βΊ Florida
SOLAR + STORAGE Β· SOUTHEASTSolar + storage project 425D, Leon County
Solar + storage project 425D, Leon County is a 75.0 MW solar + storage request withdrawn in the Southeast interconnection queue, in Leon County, Florida, connecting to Florida Power & Light.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2022 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 425D
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Florida Power & Light
- Developer
- Third Party
- Connection point (POI)
- Raven - Sinai 161kV line
- Location
- Leon County, Florida
- Technology
- Solar: 75.0 MW Β· Battery
- Total requested
- 75.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 19 February 2022
- Proposed online date
- December 2024
Location
Marker shows the centre of Leon County; the queue data does not give exact sites.
Other requests in Leon County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem