United States › Grid › Interconnection queues › Florida
GAS · SOUTHEASTGas project FC100382, Osceola County
Gas project FC100382, Osceola County is a 265 MW gas request in interconnection study in the Southeast interconnection queue, in Osceola County, Florida, connecting to Duke Energy Florida.
Queue statusIn planning
- PlanningQueued Dec 2025 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2030 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- FC100382
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Florida
- Developer
- Duke Energy Florida, LLC
- Connection point (POI)
- Intercession City 230 kV Substation
- Location
- Osceola County, Florida
- Technology
- Gas: 265 MW
- Total requested
- 265 MW
- Service type
- Network resource (NRIS)
- Study phase
- In Progress (unknown study)
- Queue status
- Active
- Entered queue
- 12 December 2025
- Proposed online date
- December 2030
Location
Marker shows the centre of Osceola County; the queue data does not give exact sites.
Other requests in Osceola County
- Solar project 326, Osceola CountySolar · 74.9 MW · under construction
- Solar project 325, Osceola CountySolar · 74.9 MW · under construction
- Bull Creek (Osceola Generating Station)Gas · 555 MW · agreement signed
- Gas project 4, Osceola CountyGas · 537 MW · in study
- Gas project FC100386, Osceola CountyGas · 265 MW · in study
- Storey Bend SouthSolar · 74.5 MW · in study
- Storey BendSolar · 74.5 MW · in study
- Harmony 2Solar · 74.5 MW · in study
- Gas project 72, Osceola CountyGas · 340 MW · built
- Gas project 74, Osceola CountyGas · 170 MW · built
- Holopaw HarmonySolar · 74.5 MW · built
- Solar project 142, Osceola CountySolar · 617 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem