Solar project FC100385, Suwannee County

Solar project FC100385, Suwannee County is a 74.9 MW solar request in interconnection study in the Southeast interconnection queue, in Suwannee County, Florida, connecting to Duke Energy Florida.

Queue statusIn planning
  1. PlanningQueued Dec 2025 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Jun 2030 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
FC100385
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Duke Energy Florida
Developer
Duke Energy Florida, LLC
Connection point (POI)
Fort White - Suwannee 230 kV
Location
Suwannee County, Florida
Technology
Solar: 74.9 MW
Total requested
74.9 MW
Service type
NRIS and ERIS
Study phase
In Progress (unknown study)
Queue status
Active
Entered queue
12 December 2025
Proposed online date
June 2030

Location

Marker shows the centre of Suwannee County; the queue data does not give exact sites.

Power plants in Florida · Transmission lines in Florida

Other requests in Suwannee County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem