GAS Β· SOUTHEASTGas project 112, Suwannee County
Gas project 112, Suwannee County is a 950 MW gas request withdrawn in the Southeast interconnection queue, in Suwannee County, Florida, connecting to Duke Energy Florida.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2011 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 112
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Florida
- Developer
- Masked
- Connection point (POI)
- Suwannee 230 kV Substation
- Location
- Suwannee County, Florida
- Technology
- Gas: 950 MW
- Total requested
- 950 MW
- Queue status
- Withdrawn
- Entered queue
- 22 July 2011
- Proposed online date
- April 2018
Location
Marker shows the centre of Suwannee County; the queue data does not give exact sites.
Other requests in Suwannee County
- Solar project 218, Suwannee CountySolar Β· 74.9 MW Β· in study
- Solar project FC100384, Suwannee CountySolar Β· 74.9 MW Β· in study
- Solar project 290, Suwannee CountySolar Β· 74.9 MW Β· in study
- Solar project FC100385, Suwannee CountySolar Β· 74.9 MW Β· in study
- Solar project 307, Suwannee CountySolar Β· 74.9 MW Β· suspended
- Solar project 305, Suwannee CountySolar Β· 74.9 MW Β· suspended
- Solar project 308, Suwannee CountySolar Β· 74.9 MW Β· suspended
- Solar project 195, Suwannee CountySolar Β· 74.9 MW Β· built
- Solar project 210, Suwannee CountySolar Β· 74.9 MW Β· built
- Solar project 202Solar Β· 74.5 MW Β· built
- Battery storage project 380, Suwannee CountyBattery storage Β· 30.0 MW Β· built
- Battery storage project 318, Suwannee CountyBattery storage Β· 5.0 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem