United States › Grid › Interconnection queues › Florida

BATTERY STORAGE · SOUTHEAST

Battery storage project 318, Suwannee County

Battery storage project 318, Suwannee County is a 5.0 MW battery storage request built and operating in the Southeast interconnection queue, in Suwannee County, Florida, connecting to Duke Energy Florida.

Queue statusOperating
  1. PlanningQueued Dec 2022 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingDec 2024 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
318
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Duke Energy Florida
Developer
Duke Energy Florida, LLC
Connection point (POI)
Suwannee 230 kV Substation
Location
Suwannee County, Florida
Technology
Battery: 5.0 MW
Total requested
5.0 MW
Service type
NRIS and ERIS
Study phase
IA Executed
Queue status
Operational
Entered queue
5 December 2022
Proposed online date
December 2024
Came online
December 2024

Location

Marker shows the centre of Suwannee County; the queue data does not give exact sites.

Power plants in Florida · Transmission lines in Florida

Other requests in Suwannee County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem