United States › Grid › Interconnection queues › Florida

SOLAR · SOUTHEAST

Solar project 195, Suwannee County

Solar project 195, Suwannee County is a 74.9 MW solar request built and operating in the Southeast interconnection queue, in Suwannee County, Florida, connecting to Duke Energy Florida.

Queue statusOperating
  1. PlanningQueued Sep 2017 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingJun 2024 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
195
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Duke Energy Florida
Developer
Duke Energy Florida, LLC
Connection point (POI)
Suwannee River Plant Substation
Location
Suwannee County, Florida
Technology
Solar: 74.9 MW
Total requested
74.9 MW
Service type
NRIS and ERIS
Study phase
IA Executed
Queue status
Operational
Entered queue
22 September 2017
Proposed online date
June 2024
Came online
June 2024

Location

Marker shows the centre of Suwannee County; the queue data does not give exact sites.

Power plants in Florida · Transmission lines in Florida

Other requests in Suwannee County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem