United States › Grid › Interconnection queues › Florida
SOLAR · SOUTHEASTSolar project 308, Suwannee County
Solar project 308, Suwannee County is a 74.9 MW solar request suspended in the Southeast interconnection queue, in Suwannee County, Florida, connecting to Duke Energy Florida.
Queue statusPaused / redesign
- PlanningQueued Apr 2022 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2026 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 308
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Florida
- Developer
- CP Ironwood, LLC
- Connection point (POI)
- Ft White - Suwannee River
- Location
- Suwannee County, Florida
- Technology
- Solar: 74.9 MW
- Total requested
- 74.9 MW
- Service type
- NRIS and ERIS
- Queue status
- Suspended
- Entered queue
- 15 April 2022
- Proposed online date
- December 2026
Location
Marker shows the centre of Suwannee County; the queue data does not give exact sites.
Other requests in Suwannee County
- Solar project 218, Suwannee CountySolar · 74.9 MW · in study
- Solar project FC100384, Suwannee CountySolar · 74.9 MW · in study
- Solar project 290, Suwannee CountySolar · 74.9 MW · in study
- Solar project FC100385, Suwannee CountySolar · 74.9 MW · in study
- Solar project 307, Suwannee CountySolar · 74.9 MW · suspended
- Solar project 305, Suwannee CountySolar · 74.9 MW · suspended
- Solar project 195, Suwannee CountySolar · 74.9 MW · built
- Solar project 210, Suwannee CountySolar · 74.9 MW · built
- Solar project 202Solar · 74.5 MW · built
- Battery storage project 380, Suwannee CountyBattery storage · 30.0 MW · built
- Battery storage project 318, Suwannee CountyBattery storage · 5.0 MW · built
- Gas project 112, Suwannee CountyGas · 950 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem