United States βΊ Grid βΊ Interconnection queues βΊ Connecticut
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in Connecticut (2023 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Battery Storage Battery storage |
326 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
326 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
305 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
300 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
300 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
289 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
289 MW | Withdrawn / abandoned |
| Battery Storage Addition Battery storage |
284 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
263 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
257 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
238 MW | Withdrawn / abandoned |
| Gas Turbine Gas |
233 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
201 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
197 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
175 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
156 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
136 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
135 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
103 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
102 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
100 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
75.0 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
53.7 MW | Withdrawn / abandoned |
| Enfield DG Cluster Solar + storage |
18.8 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
10.0 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
7.0 MW | Withdrawn / abandoned |
| Scitico DG Cluster Solar + storage |
5.2 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
5.1 MW | Withdrawn / abandoned |
| Fuel Cell Other |
1.8 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)