United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESInterconnection queue in ERCOT (Texas) (2018 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Danish Fields Solar Solar Β· Danish Fields Solar, LLC |
603 MW | Agreement signed |
| Siete Onshore wind Β· Apex Clean Energy |
493 MW | Agreement signed |
| Green Holly Solar Solar Β· Copenhagen Infrastructure Partners Fund IV |
414 MW | Paused / redesign |
| Baird North Wind Onshore wind Β· BMP Wind, LLC |
340 MW | Agreement signed |
| Quantum Solar Solar + storage Β· IP QUANTUM II, LLC |
322 MW | Agreement signed |
| Delilah Solar 2 Solar Β· Delilah Solar Energy II LLC |
318 MW | Agreement signed |
| El Sauz Ranch Onshore wind Β· El Sauz Ranch Wind, LLC |
302 MW | Agreement signed |
| Pine Forest Solar Solar Β· Pine Forest Solar I, LLC |
302 MW | Agreement signed |
| Delilah Solar 1 Solar Β· Delilah Solar Energy LLC |
300 MW | Agreement signed |
| Arroyo Del Bisonte Solar Solar Β· Sunchase Power |
300 MW | Paused / redesign |
| Pierce Wind Onshore wind |
300 MW | Paused / redesign |
| Shifting Gale Wind Onshore wind |
289 MW | Paused / redesign |
| Foxtrot Wind Onshore wind Β· Lincoln Clean |
268 MW | Agreement signed |
| Red Holly Solar Solar + storage Β· GreenGo Energy |
260 MW | Agreement signed |
| Tulsita Solar Solar Β· Ray Ranch Solar LLC |
256 MW | Agreement signed |
| Maleza Solar Solar + storage Β· Brush Solar LLC |
255 MW | Agreement signed |
| Roseland Solar Solar Β· Enel Green Power Roseland Solar, LLC |
254 MW | Agreement signed |
| Adamstown Solar Solar Β· Adams Creek Solar Project, LLC |
251 MW | Agreement signed |
| Samson Solar 1 Solar Β· Samson Solar Energy LLC |
250 MW | Agreement signed |
| Eastbell Milam Solar Solar Β· EDP RENEWABLES NORTH AMERICA LLC |
245 MW | Agreement signed |
| Peyton Creek Wind II Onshore wind Β· RWE Renewables Development, LLC |
241 MW | Agreement signed |
| Gulf Wind 2 Onshore wind |
227 MW | Paused / redesign |
| Castro Solar Solar Β· Castro Solar One, LLC |
225 MW | Agreement signed |
| Walleye Solar Solar Β· Sandow Lakes Ranch Solar II, LLC |
215 MW | In study |
| Diamondback solar Solar Β· Diamondback Solar, LLC |
204 MW | Agreement signed |
| Rueter Solar Solar |
200 MW | Paused / redesign |
| Desert Rose Solar Solar |
200 MW | Paused / redesign |
| Fagus Solar Park 1 SLF Solar + storage Β· Excel Advantage Services, LLC dba Misae Solar Park II |
166 MW | Agreement signed |
| CAROL wind Onshore wind |
165 MW | Paused / redesign |
| Indigo Solar Solar + storage Β· Innovative Solar 245, LLC |
150 MW | Agreement signed |
| La Casa Wind Onshore wind Β· LA CASA WIND, LLC |
148 MW | Agreement signed |
| Wang Solar SLF Solar + storage Β· BT Yixin Solar, LLC |
145 MW | In study |
| Starr Solar Ranch Solar + storage Β· Starr Solar Ranch 1 LLC |
137 MW | Agreement signed |
| Arroyo Solar Solar + storage Β· BT Cantwell Solar, LLC |
100 MW | Agreement signed |
| Tyson Nick Solar Solar Β· Tyson Nick Solar Project, LLC |
90.0 MW | Paused / redesign |
| R Massengale Gas |
58.0 MW | Paused / redesign |
| Red Holly Storage Solar + storage Β· GreenGo Energy |
50.0 MW | Agreement signed |
| Red Holly Storage 1 Solar + storage Β· GreenGo Energy |
50.0 MW | Agreement signed |
| SP TX-12B Phase III Solar Β· ConEd Development |
40.0 MW | In study |
| Half Moon Battery Battery storage |
30.2 MW | Paused / redesign |
| Brandon Gas |
21.0 MW | Paused / redesign |
| Air Products GCA Gas Β· Air Products |
14.0 MW | Agreement signed |
| Blue Summit repower Onshore wind |
9.9 MW | Paused / redesign |
| Indian Mesa repower Onshore wind Β· Nextera |
9.3 MW | Agreement signed |
| Sweetwater 1 repower Onshore wind Β· Leeward Energy |
3.0 MW | Agreement signed |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)68 Β· 16.4 GW
- MISO (Midcontinent)61 Β· 10.3 GW
- PJM (Mid-Atlantic, Midwest)68 Β· 10.1 GW
- ERCOT (Texas)45 Β· 9,218 MW
- SPP (Southwest Power Pool)42 Β· 6,803 MW
- CAISO (California)23 Β· 6,790 MW
- NYISO (New York)15 Β· 3,444 MW
- Southeast (non-ISO utilities)21 Β· 2,381 MW
- ISO-NE (New England)5 Β· 1,661 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)