OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in ERCOT (Texas) (2015 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Hecate McCamey C Solar Solar Β· Hecate Energy |
600 MW | Withdrawn / abandoned |
| Panda Sherman 2 G Gas Β· Panda Funds |
543 MW | Withdrawn / abandoned |
| Hecate McCamey B Solar Solar Β· Hecate Energy |
400 MW | Withdrawn / abandoned |
| Powersite Karnes Gas Β· Powersite |
396 MW | Withdrawn / abandoned |
| Pecan Creek 2 Gas Gas Β· NTE Energy |
350 MW | Withdrawn / abandoned |
| Zapata I W Onshore wind Β· Nextera |
300 MW | Withdrawn / abandoned |
| Last Stop Solar Solar Β· OE Renewables |
280 MW | Withdrawn / abandoned |
| Dawn Wind Ranch Onshore wind Β· Cielo |
200 MW | Withdrawn / abandoned |
| Hecate McCamey A Solar Solar Β· Hecate Energy |
200 MW | Withdrawn / abandoned |
| Tecovas 1 W Onshore wind Β· Engie |
200 MW | Withdrawn / abandoned |
| Tecovas 2 W Onshore wind Β· Engie |
200 MW | Withdrawn / abandoned |
| Salt Fork 2 Wind Onshore wind Β· Cielo |
200 MW | Withdrawn / abandoned |
| Mustang Draw Solar Solar Β· Lincoln Clean |
200 MW | Withdrawn / abandoned |
| Winkler Solar Solar Β· Sunpower Corporation |
150 MW | Withdrawn / abandoned |
| Hecate Solar C Solar Β· Hecate Energy |
150 MW | Withdrawn / abandoned |
| Green Valley Gas Gas Β· Denton Municipal Electric |
112 MW | Withdrawn / abandoned |
| Upton Solar Solar Β· Clearway Energy |
105 MW | Withdrawn / abandoned |
| Pecos Solar II Solar Β· Duke Energy |
102 MW | Withdrawn / abandoned |
| Estacado Solar Solar Β· Avangrid |
100 MW | Withdrawn / abandoned |
| Permian Solar Solar Β· SolarCity |
100 MW | Withdrawn / abandoned |
| NW Andrews Solar Solar Β· One Energy Renewables |
60.0 MW | Withdrawn / abandoned |
| Parker Ranch Solar 3 Solar Β· SunPower |
56.0 MW | Withdrawn / abandoned |
| Salt Fork Wind Expansion Onshore wind Β· Southern Power Company |
54.0 MW | Withdrawn / abandoned |
| Freer Wind Onshore wind Β· EDF Renewables |
53.0 MW | Withdrawn / abandoned |
| River Rock Solar Solar Β· RES Americas |
50.0 MW | Withdrawn / abandoned |
| Hecate Solar A Solar Β· Hecate Energy |
50.0 MW | Withdrawn / abandoned |
| Tarbush Solar Solar Β· One Energy Renewables |
47.5 MW | Withdrawn / abandoned |
| AES Parkdale Storage Battery storage Β· AES |
20.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- PJM (Mid-Atlantic, Midwest)231 Β· 27.2 GW
- MISO (Midcontinent)53 Β· 17.2 GW
- CAISO (California)91 Β· 12.3 GW
- SPP (Southwest Power Pool)72 Β· 11.1 GW
- ISO-NE (New England)46 Β· 7,500 MW
- West (non-ISO utilities)197 Β· 6,025 MW
- ERCOT (Texas)28 Β· 5,278 MW
- Southeast (non-ISO utilities)49 Β· 4,719 MW
- NYISO (New York)33 Β· 4,251 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)