ONSHORE WIND Β· ERCOTSalt Fork 2 Wind
Salt Fork 2 Wind is a 200 MW onshore wind request withdrawn in the ERCOT interconnection queue.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2015 (completed)
- Withdrawn / abandoned (project stopped here)
- ConsentedAug 2015 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 16INR0082
- Grid region
- ERCOT (Texas)
- Developer
- Cielo
- Connection point (POI)
- 79000 Gray 345kV
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Study phase
- IA and FIS Pending
- Queue status
- Withdrawn
- Entered queue
- 13 February 2015
- Agreement signed
- 18 August 2015
- Proposed online date
- August 2017
Location
No county location in the queue data.
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem