United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESWithdrawn queue requests in ERCOT (Texas) (2011 requests)
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Hereford Wind Onshore wind Β· Higher Power Energy, LLC |
500 MW | Withdrawn / abandoned |
| Los Vientos Phase III Onshore wind Β· Duke Energy Generation Services |
400 MW | Withdrawn / abandoned |
| Apex Bethel CAES Battery storage Β· Apex CAES |
324 MW | Withdrawn / abandoned |
| Wildrose Wind Onshore wind Β· S Power |
303 MW | Withdrawn / abandoned |
| Blanco Canyon Wind Onshore wind Β· Blanco Canyon Wind Development |
300 MW | Withdrawn / abandoned |
| Comanche Mesa Onshore wind Β· Pioneer Green Energy, LLC |
300 MW | Withdrawn / abandoned |
| Changing Winds Onshore wind Β· TriGlobal |
288 MW | Withdrawn / abandoned |
| Matagorda Energy Center Battery storage Β· Apex Compressed Air Energy Storage |
280 MW | Withdrawn / abandoned |
| cancelled Chamisa CAES Battery storage Β· Chamisa |
270 MW | Withdrawn / abandoned |
| Greenwich/Happy Whiteface Onshore wind Β· Pace Global Energy Svcs |
242 MW | Withdrawn / abandoned |
| Hidalgo Wind Farm Onshore wind Β· Horizon Wind Energy |
200 MW | Withdrawn / abandoned |
| Gulf Wind 2 Onshore wind Β· Pattern Energy Group |
200 MW | Withdrawn / abandoned |
| Cedar Cap Wind Onshore wind Β· Gamesa |
150 MW | Withdrawn / abandoned |
| SSE phase 1 Onshore wind Β· Spinning Star Energy LLC |
113 MW | Withdrawn / abandoned |
| Miami Wind G3 Onshore wind Β· Invenergy |
111 MW | Withdrawn / abandoned |
| West Ranch Solar Solar Β· Pristine Sun |
100 MW | Withdrawn / abandoned |
| Sandy Hills Solar Solar Β· SunPower |
100 MW | Withdrawn / abandoned |
| Onion Creek Wind Onshore wind Β· Bobcat Bluff Wind Project LLC |
100 MW | Withdrawn / abandoned |
| Oilton 1 Wind Onshore wind Β· Spinnaker Wind |
94.0 MW | Withdrawn / abandoned |
| Limestone Wind Farm Onshore wind Β· Pioneer Green Energy, LLC |
71.0 MW | Withdrawn / abandoned |
| Alpine Solar 1 Solar Β· Element Power US, LLC |
50.0 MW | Withdrawn / abandoned |
| Long Draw Energy Project Solar Β· Turner/Ross Wind Development LLC |
38.0 MW | Withdrawn / abandoned |
| Mustang Wind Onshore wind Β· Pioneer Green Energy, LLC |
30.0 MW | Withdrawn / abandoned |
| Mustang Solar Project Solar Β· Pioneer Green Energy, LLC |
30.0 MW | Withdrawn / abandoned |
| Comanche Ridge Wind Onshore wind Β· Baryonyx |
24.0 MW | Withdrawn / abandoned |
| RE Trent Solar Β· Recurrent Energy |
20.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- CAISO (California)187 Β· 30.0 GW
- PJM (Mid-Atlantic, Midwest)289 Β· 22.9 GW
- Southeast (non-ISO utilities)32 Β· 14.0 GW
- West (non-ISO utilities)157 Β· 12.8 GW
- MISO (Midcontinent)51 Β· 10.5 GW
- SPP (Southwest Power Pool)43 Β· 8,099 MW
- ERCOT (Texas)26 Β· 4,638 MW
- ISO-NE (New England)14 Β· 1,774 MW
- NYISO (New York)9 Β· 1,394 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)