United States β€Ί Grid β€Ί Interconnection queues

OCTARY USA Β· INTERCONNECTION QUEUES

Withdrawn queue requests in ERCOT (Texas) (2011 requests)

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown264,638 MW
Active in queue0.0 MW0 requests
Agreement signed0.0 MW0 requests
Withdrawn264,638 MW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

26 requests
ProjectCapacityStatusLocationRegionQueuedOnline
Hereford Wind
Onshore wind Β· Higher Power Energy, LLC
500 MWWithdrawn / abandoned ERCOT May 2011target 2050
Los Vientos Phase III
Onshore wind Β· Duke Energy Generation Services
400 MWWithdrawn / abandoned ERCOT Oct 2011target 2050
Apex Bethel CAES
Battery storage Β· Apex CAES
324 MWWithdrawn / abandoned ERCOT Nov 2011target 2020
Wildrose Wind
Onshore wind Β· S Power
303 MWWithdrawn / abandoned Swisher, TXERCOT Apr 2011target 2021
Blanco Canyon Wind
Onshore wind Β· Blanco Canyon Wind Development
300 MWWithdrawn / abandoned ERCOT Jul 2011target 2050
Comanche Mesa
Onshore wind Β· Pioneer Green Energy, LLC
300 MWWithdrawn / abandoned ERCOT Mar 2011target 2050
Changing Winds
Onshore wind Β· TriGlobal
288 MWWithdrawn / abandoned ERCOT Oct 2011target 2018
Matagorda Energy Center
Battery storage Β· Apex Compressed Air Energy Storage
280 MWWithdrawn / abandoned ERCOT Nov 2011target 2018
cancelled Chamisa CAES
Battery storage Β· Chamisa
270 MWWithdrawn / abandoned ERCOT Apr 2011target 2018
Greenwich/Happy Whiteface
Onshore wind Β· Pace Global Energy Svcs
242 MWWithdrawn / abandoned ERCOT Sep 2011target 2014
Hidalgo Wind Farm
Onshore wind Β· Horizon Wind Energy
200 MWWithdrawn / abandoned ERCOT Apr 2011target 2014
Gulf Wind 2
Onshore wind Β· Pattern Energy Group
200 MWWithdrawn / abandoned ERCOT Jun 2011target 2016
Cedar Cap Wind
Onshore wind Β· Gamesa
150 MWWithdrawn / abandoned ERCOT Nov 2011target 2016
SSE phase 1
Onshore wind Β· Spinning Star Energy LLC
113 MWWithdrawn / abandoned ERCOT Jul 2011target 2050
Miami Wind G3
Onshore wind Β· Invenergy
111 MWWithdrawn / abandoned ERCOT Jun 2011target 2016
West Ranch Solar
Solar Β· Pristine Sun
100 MWWithdrawn / abandoned ERCOT Jun 2011target 2018
Sandy Hills Solar
Solar Β· SunPower
100 MWWithdrawn / abandoned ERCOT Mar 2011target 2017
Onion Creek Wind
Onshore wind Β· Bobcat Bluff Wind Project LLC
100 MWWithdrawn / abandoned ERCOT Jan 2011
Oilton 1 Wind
Onshore wind Β· Spinnaker Wind
94.0 MWWithdrawn / abandoned ERCOT Feb 2011target 2050
Limestone Wind Farm
Onshore wind Β· Pioneer Green Energy, LLC
71.0 MWWithdrawn / abandoned ERCOT Oct 2011target 2013
Alpine Solar 1
Solar Β· Element Power US, LLC
50.0 MWWithdrawn / abandoned ERCOT Feb 2011target 2050
Long Draw Energy Project
Solar Β· Turner/Ross Wind Development LLC
38.0 MWWithdrawn / abandoned ERCOT Mar 2011target 2015
Mustang Wind
Onshore wind Β· Pioneer Green Energy, LLC
30.0 MWWithdrawn / abandoned ERCOT Mar 2011target 2014
Mustang Solar Project
Solar Β· Pioneer Green Energy, LLC
30.0 MWWithdrawn / abandoned ERCOT Feb 2011target 2015
Comanche Ridge Wind
Onshore wind Β· Baryonyx
24.0 MWWithdrawn / abandoned ERCOT Sep 2011target 2014
RE Trent
Solar Β· Recurrent Energy
20.0 MWWithdrawn / abandoned ERCOT Oct 2011target 2015

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)