ONSHORE WIND Β· ERCOT

Changing Winds

Changing Winds is a 288 MW onshore wind request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2011 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedFeb 2015 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
13INR0045
Grid region
ERCOT (Texas)
Developer
TriGlobal
Connection point (POI)
79501 Ogallala 345kV
Technology
Wind: 288 MW
Total requested
288 MW
Study phase
IA and FIS Pending
Queue status
Withdrawn
Entered queue
24 October 2011
Agreement signed
27 February 2015
Proposed online date
December 2018

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem