United States β€Ί Grid β€Ί Interconnection queues

ONSHORE WIND Β· ERCOT

Hereford Wind

Hereford Wind is a 500 MW onshore wind request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2011 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
13INR0039
Grid region
ERCOT (Texas)
Developer
Higher Power Energy, LLC
Technology
Wind: 500 MW
Total requested
500 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
16 May 2011
Proposed online date
December 2050

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem