United States β€Ί Grid β€Ί Interconnection queues

BATTERY STORAGE Β· ERCOT

cancelled Chamisa CAES

cancelled Chamisa CAES is a 270 MW battery storage request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2011 (completed)
  2. Withdrawn / abandonedJan 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
14INR0011
Grid region
ERCOT (Texas)
Developer
Chamisa
Connection point (POI)
tap 345kV 79501 Ogallala - 79503 Tule Canyon
Technology
Other Storage: 270 MW
Total requested
270 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
13 April 2011
Proposed online date
July 2018
Withdrawn
January 2019

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem