United States › Grid › Interconnection queues › California
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in California — page 9
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| South Bristol Mountains Wind Farm Other |
429 MW | Withdrawn / abandoned |
| Souza Solar Solar + storage |
429 MW | Withdrawn / abandoned |
| Conlouge Solar Solar + storage |
428 MW | Withdrawn / abandoned |
| Tumey Solar + storage |
428 MW | Withdrawn / abandoned |
| Hela Solar + storage |
428 MW | Withdrawn / abandoned |
| Potosi Solar + storage |
428 MW | Withdrawn / abandoned |
| Dove Solar + storage |
428 MW | Withdrawn / abandoned |
| Stonehaven Solar + storage |
428 MW | Withdrawn / abandoned |
| Dumont Solar + storage |
428 MW | Withdrawn / abandoned |
| Big Horn Energy Storage Battery storage |
425 MW | Withdrawn / abandoned |
| Westside Canal Energy Center Solar + storage |
425 MW | Withdrawn / abandoned |
| Long Beach Peaker Project Gas |
425 MW | Withdrawn / abandoned |
| Frazier Es Battery storage |
420 MW | Withdrawn / abandoned |
| Barstow Solar II Solar |
420 MW | Withdrawn / abandoned |
| Amanece Solar Solar + storage |
420 MW | Withdrawn / abandoned |
| Creosote Solar |
419 MW | Withdrawn / abandoned |
| Creekside Battery storage |
418 MW | Withdrawn / abandoned |
| Corby 3 Battery storage |
417 MW | Withdrawn / abandoned |
| Luna Battery storage |
417 MW | Withdrawn / abandoned |
| All American Solar Solar |
415 MW | Withdrawn / abandoned |
| South Willow Solar |
413 MW | Withdrawn / abandoned |
| Summit Hybrid Solar + storage |
412 MW | Withdrawn / abandoned |
| Mystic Ridge Solar + storage |
412 MW | Withdrawn / abandoned |
| Brisbane Es Battery storage |
412 MW | Withdrawn / abandoned |
| Bradmore BESS Fka Bradmore Es Battery storage |
412 MW | Withdrawn / abandoned |
| Superba Solar + storage |
411 MW | Withdrawn / abandoned |
| Boulder Oaks Hybrid Wind + storage |
411 MW | Withdrawn / abandoned |
| Boulder Oaks Hybrid 2 Wind + storage |
411 MW | Withdrawn / abandoned |
| Ardilla Battery storage |
411 MW | Withdrawn / abandoned |
| Golden Square Solar + storage |
410 MW | Withdrawn / abandoned |
| Dahlia Solar Solar + storage |
410 MW | Withdrawn / abandoned |
| Pilot Knob Solar Solar + storage |
409 MW | Withdrawn / abandoned |
| Maravillosa Solar 2 Solar + storage |
408 MW | Withdrawn / abandoned |
| Bulldog Energy Storage Battery storage |
408 MW | Withdrawn / abandoned |
| Solar 373 Solar + storage |
408 MW | Withdrawn / abandoned |
| Calypso Solar 2 Solar |
407 MW | Withdrawn / abandoned |
| Orca Other |
407 MW | Withdrawn / abandoned |
| Seguro Storage Battery storage |
407 MW | Withdrawn / abandoned |
| High Plains Storage Battery storage |
406 MW | Withdrawn / abandoned |
| Doradus Solar + storage |
406 MW | Withdrawn / abandoned |
| Rigal Solar + storage |
406 MW | Withdrawn / abandoned |
| Grapevine 1 Battery storage |
406 MW | Withdrawn / abandoned |
| Sprout Battery storage |
406 MW | Withdrawn / abandoned |
| Ash Tree Hybrid Solar Solar + storage |
406 MW | Withdrawn / abandoned |
| Quercus Battery storage |
406 MW | Withdrawn / abandoned |
| Magnolia Battery storage |
406 MW | Withdrawn / abandoned |
| Adagio Battery storage |
406 MW | Withdrawn / abandoned |
| Sing Battery storage |
406 MW | Withdrawn / abandoned |
| Midland Es Battery storage |
405 MW | Withdrawn / abandoned |
| Potentia-Viridi 2 Battery storage |
405 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)