Requests shown2,138571.6 GW
Active in queue179.2 GW464 requests
Agreement signed81.7 GW215 requests
Withdrawn2,138571.6 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

2,138 requests · page 9 of 43
ProjectCapacityStatusLocationRegionQueuedOnline
South Bristol Mountains Wind Farm
Other
429 MWWithdrawn / abandoned San Bernardino, CACAISO Jul 2007target 2010
Souza Solar
Solar + storage
429 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2021target 2025
Conlouge Solar
Solar + storage
428 MWWithdrawn / abandoned Tulare, CACAISO Apr 2021target 2025
Tumey
Solar + storage
428 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Hela
Solar + storage
428 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Potosi
Solar + storage
428 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Dove
Solar + storage
428 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Stonehaven
Solar + storage
428 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Dumont
Solar + storage
428 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Big Horn Energy Storage
Battery storage
425 MWWithdrawn / abandoned Imperial, CACAISO Apr 2020target 2024
Westside Canal Energy Center
Solar + storage
425 MWWithdrawn / abandoned Imperial, CACAISO May 2017target 2021
Long Beach Peaker Project
Gas
425 MWWithdrawn / abandoned Los Angeles, CACAISO May 2005target 2010
Frazier Es
Battery storage
420 MWWithdrawn / abandoned Tulare, CACAISO Apr 2015target 2021
Barstow Solar II
Solar
420 MWWithdrawn / abandoned San Bernardino, CACAISO Feb 2010target 2013
Amanece Solar
Solar + storage
420 MWWithdrawn / abandoned CACAISO Apr 2023target 2029
Creosote
Solar
419 MWWithdrawn / abandoned Kern, CACAISO May 2017target 2021
Creekside
Battery storage
418 MWWithdrawn / abandoned Santa Clara, CACAISO May 2016target 2020
Corby 3
Battery storage
417 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
Luna
Battery storage
417 MWWithdrawn / abandoned CACAISO Apr 2023target 2027
All American Solar
Solar
415 MWWithdrawn / abandoned Kern, CACAISO May 2016target 2020
South Willow
Solar
413 MWWithdrawn / abandoned CACAISO Apr 2023target 2030
Summit Hybrid
Solar + storage
412 MWWithdrawn / abandoned San Bernardino, CACAISO Apr 2021target 2025
Mystic Ridge
Solar + storage
412 MWWithdrawn / abandoned San Benito, CACAISO Apr 2023target 2028
Brisbane Es
Battery storage
412 MWWithdrawn / abandoned San Mateo, CACAISO Apr 2015target 2021
Bradmore BESS Fka Bradmore Es
Battery storage
412 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2015target 2021
Superba
Solar + storage
411 MWWithdrawn / abandoned Fresno, CACAISO Apr 2023target 2029
Boulder Oaks Hybrid
Wind + storage
411 MWWithdrawn / abandoned San Diego, CACAISO Apr 2019target 2023
Boulder Oaks Hybrid 2
Wind + storage
411 MWWithdrawn / abandoned San Diego, CACAISO Apr 2020target 2023
Ardilla
Battery storage
411 MWWithdrawn / abandoned Riverside, CACAISO Apr 2021target 2032
Golden Square
Solar + storage
410 MWWithdrawn / abandoned Fresno, CACAISO May 2017target 2021
Dahlia Solar
Solar + storage
410 MWWithdrawn / abandoned Kings, CACAISO Apr 2021target 2026
Pilot Knob Solar
Solar + storage
409 MWWithdrawn / abandoned CACAISO Apr 2023target 2026
Maravillosa Solar 2
Solar + storage
408 MWWithdrawn / abandoned CACAISO Apr 2023target 2029
Bulldog Energy Storage
Battery storage
408 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2020target 2023
Solar 373
Solar + storage
408 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Calypso Solar 2
Solar
407 MWWithdrawn / abandoned Riverside, CACAISO Apr 2023target 2028
Orca
Other
407 MWWithdrawn / abandoned CACAISO Apr 2023target 2028
Seguro Storage
Battery storage
407 MWWithdrawn / abandoned San Diego, CACAISO Apr 2020target 2032
High Plains Storage
Battery storage
406 MWWithdrawn / abandoned San Luis Obispo, CACAISO Apr 2021target 2024
Doradus
Solar + storage
406 MWWithdrawn / abandoned Kern, CACAISO Apr 2019target 2022
Rigal
Solar + storage
406 MWWithdrawn / abandoned Kern, CACAISO Apr 2019target 2022
Grapevine 1
Battery storage
406 MWWithdrawn / abandoned Kern, CACAISO May 2016target 2020
Sprout
Battery storage
406 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2021target 2030
Ash Tree Hybrid Solar
Solar + storage
406 MWWithdrawn / abandoned Fresno, CACAISO Apr 2019target 2022
Quercus
Battery storage
406 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2021target 2034
Magnolia
Battery storage
406 MWWithdrawn / abandoned Riverside, CACAISO Apr 2021target 2032
Adagio
Battery storage
406 MWWithdrawn / abandoned Los Angeles, CACAISO Apr 2021target 2032
Sing
Battery storage
406 MWWithdrawn / abandoned San Diego, CACAISO Apr 2023target 2030
Midland Es
Battery storage
405 MWWithdrawn / abandoned San Luis Obispo, CACAISO Feb 2021target 2032
Potentia-Viridi 2
Battery storage
405 MWWithdrawn / abandoned San Joaquin, CACAISO Apr 2023target 2028
Page 9 of 43

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)