United States › Grid › Interconnection queues › California

WIND + STORAGE · CAISO

Boulder Oaks Hybrid

Boulder Oaks Hybrid is a 411 MW wind + storage request withdrawn in the CAISO interconnection queue, in San Diego County, California, connecting to SDGE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2019 (completed)
  2. Withdrawn / abandonedApr 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1672
Grid region
CAISO (California)
Utility / transmission owner
SDGE
Connection point (POI)
ECO-Miguel 500kV
Location
San Diego County, California
Technology
Wind: 206 MW · Battery: 205 MW
Total requested
411 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
15 April 2019
Proposed online date
June 2023
Withdrawn
April 2020

Location

Marker shows the centre of San Diego County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in San Diego County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem