United States β€Ί Grid β€Ί Interconnection queues β€Ί California

SOLAR Β· CAISO

Calypso Solar 2

Calypso Solar 2 is a 407 MW solar request withdrawn in the CAISO interconnection queue, in Riverside County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2023 (completed)
  2. Withdrawn / abandonedDec 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
2256
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
COLORADO RIVER 500 kV
Location
Riverside County, California
Technology
Solar: 407 MW
Total requested
407 MW
Service type
Energy only (ERIS)
Study phase
Caiso Cluster 15 Unvalidated
Queue status
Withdrawn
Entered queue
17 April 2023
Proposed online date
October 2028
Withdrawn
December 2025

Location

Marker shows the centre of Riverside County; the queue data does not give exact sites.

Power plants in California Β· Transmission lines in California

Other requests in Riverside County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem