United States › Grid › Interconnection queues › California

GAS · CAISO

Long Beach Peaker Project

Long Beach Peaker Project is a 425 MW gas request withdrawn in the CAISO interconnection queue, in Los Angeles County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2005 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
65
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Long Beach Gen Station 220kv switchyard
Location
Los Angeles County, California
Technology
Gas: 425 MW
Total requested
425 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
6 May 2005
Proposed online date
June 2010

Location

Marker shows the centre of Los Angeles County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Los Angeles County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem