BATTERY STORAGE Β· CAISO

Magnolia

Magnolia is a 406 MW battery storage request withdrawn in the CAISO interconnection queue, in Riverside County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2021 (completed)
  2. Withdrawn / abandonedDec 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
2112
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Mira Loma Substation 230 kV
Location
Riverside County, California
Technology
Battery: 406 MW
Total requested
406 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
15 April 2021
Proposed online date
April 2032
Withdrawn
December 2022

Location

Marker shows the centre of Riverside County; the queue data does not give exact sites.