United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESQueue requests in study in the USA (2022 requests) — page 7
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| White Tail Solar Solar · Mule Deer Solar LLC |
227 MW | In study |
| Dunkel BESS Battery storage · Momentum Energy Storage Partners |
226 MW | In study |
| Solar project J2673, Clare County Solar |
225 MW | In study |
| Solar + storage project 2022-G2, Mohave County Solar + storage |
225 MW | In study |
| Solar project IC-1098, Taylor County Solar |
225 MW | Paused / redesign |
| Solar project J2668, Mason County Solar |
225 MW | In study |
| Solar + storage project 2022-G5, Mohave County Solar + storage |
225 MW | In study |
| Solar project J3139, Holmes County Solar |
225 MW | In study |
| Solar + storage project GI-DISIS-2022-49, Prowers County Solar + storage |
225 MW | Paused / redesign |
| Solar project J2670, Mason County Solar |
223 MW | In study |
| Olympic BESS Battery storage · SMT Olympic BESS LLC |
223 MW | In study |
| Solar + storage project J2924, Columbia County Solar + storage |
222 MW | In study |
| Shoshana Storage Battery storage · Shoshana Storage Project LLC |
221 MW | In study |
| Solar project J2554, Putnam County Solar |
220 MW | In study |
| Solar project J2444, Van Buren County Solar |
220 MW | In study |
| Solar project J2814, Kalamazoo County Solar |
220 MW | In study |
| Sepanta Solar Solar · BREG - Belgian Renewable Energy Group |
217 MW | In study |
| Solar project J2599, Redwood County Solar |
216 MW | In study |
| Solar project J2611, Alcona County Solar |
215 MW | In study |
| Puerto Del Sol 2 Solar · PUERTO DEL SOL, LLC |
214 MW | In study |
| Puerto Del Sol 1 Solar · PUERTO DEL SOL, LLC |
214 MW | In study |
| Replacing 30 MW of existing coal generation with BESS at Burlington Generation Station; Burlington 5 Other |
212 MW | In study |
| Bessie Storage Battery storage · Bessie Energy Storage, LLC |
211 MW | In study |
| Solar project J2811, Cerro Gordo County Solar |
210 MW | In study |
| Battery storage project AI1-185, Augusta County Battery storage |
210 MW | In study |
| Solar project J2553, Cerro Gordo County Solar |
210 MW | In study |
| Solar + storage project AH2-419, Laporte County Solar + storage |
210 MW | In study |
| Forts Trail BESS Solar + storage · JC Central Bluff, LLC |
209 MW | In study |
| Solar project J2050, Macon County Solar |
208 MW | In study |
| St. Gall Solar Solar · St. Gall Solar LLC |
207 MW | In study |
| Onshore wind project C2-92, Bingham County Onshore wind · PacifiCorp |
206 MW | In study |
| Rock N' Roll Storage Two Solar + storage · Rock N‚Äô Roll Solar, LLC |
206 MW | In study |
| Onshore wind project MPC04400, Grand Forks County Onshore wind |
206 MW | In study |
| Soda Lake BESS 2 SLF Solar + storage · Crane II Solar Electric, LLC |
205 MW | In study |
| Gas project J2947, Rock County Gas |
205 MW | In study |
| Citrus Grove Energy Storage Battery storage |
205 MW | Paused / redesign |
| Urca Solar Solar |
204 MW | Paused / redesign |
| Hoskins Solar Solar · SGT HOSKINS SOLAR PROJECT, LLC |
204 MW | In study |
| Battery storage project 16, Sacramento County Battery storage |
204 MW | In study |
| Stockdale BESS Battery storage |
204 MW | Paused / redesign |
| Utica BESS Battery storage |
204 MW | Paused / redesign |
| Cornwall BESS Battery storage |
204 MW | Paused / redesign |
| Sierra Diablo Energy Storage Battery storage · SIERRA DIABLO ENERGY STORAGE LLC |
204 MW | In study |
| Sultan BESS Battery storage |
204 MW | Paused / redesign |
| Diamondback BESS Battery storage |
204 MW | Paused / redesign |
| Mercury Solar III Solar + storage · Mercury Solar |
204 MW | In study |
| Owens Solar Solar · Owens Solar LLC |
204 MW | Paused / redesign |
| Timberlakes Solar Solar · Donegalsol |
204 MW | In study |
| Sunlight Solar Solar |
203 MW | Paused / redesign |
| Alexandrite Storage Battery storage · Johnson Energy Storage, LLC |
203 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)251 · 87.7 GW
- MISO (Midcontinent)426 · 80.7 GW
- PJM (Mid-Atlantic, Midwest)301 · 37.9 GW
- ERCOT (Texas)172 · 33.5 GW
- Southeast (non-ISO utilities)98 · 11.2 GW
- SPP (Southwest Power Pool)21 · 3,927 MW
- ISO-NE (New England)2 · 325 MW
- NYISO (New York)1 · 20.0 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)