United States › Grid › Interconnection queues › North Dakota
ONSHORE WIND · MISOOnshore wind project MPC04400, Grand Forks County
Onshore wind project MPC04400, Grand Forks County is a 206 MW onshore wind request in interconnection study in the MISO interconnection queue, in Grand Forks County, North Dakota, connecting to Minnkota Power Cooperative.
- PlanningQueued Feb 2022 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2024 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- MPC04400
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- Minnkota Power Cooperative
- Connection point (POI)
- Center-Prairie 345 kV Line
- Location
- Grand Forks County, North Dakota
- Technology
- Wind: 206 MW
- Total requested
- 206 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Active
- Entered queue
- 4 February 2022
- Proposed online date
- December 2024
Location
Marker shows the centre of Grand Forks County; the queue data does not give exact sites.
Power plants in North Dakota · Transmission lines in North Dakota
Other requests in Grand Forks County
- Onshore wind project MPC04500, Grand Forks CountyOnshore wind · 258 MW · in study
- Onshore wind project J628, Grand Forks CountyOnshore wind · 400 MW · withdrawn
- Onshore wind project MPC04100, Grand Forks CountyOnshore wind · 300 MW · withdrawn
- Onshore wind project MPC02300, Grand Forks CountyOnshore wind · 200 MW · withdrawn
- Onshore wind project J897, Grand Forks CountyOnshore wind · 190 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem