United States β€Ί Grid β€Ί Interconnection queues β€Ί North Dakota

ONSHORE WIND Β· MISO

Onshore wind project MPC04100, Grand Forks County

Onshore wind project MPC04100, Grand Forks County is a 300 MW onshore wind request withdrawn in the MISO interconnection queue, in Grand Forks County, North Dakota, connecting to Minnkota Power Cooperative.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2019 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
MPC04100
Grid region
MISO (Midcontinent)
Utility / transmission owner
Minnkota Power Cooperative
Connection point (POI)
Prairie 230 kV
Location
Grand Forks County, North Dakota
Technology
Wind: 300 MW
Total requested
300 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
25 April 2019
Proposed online date
December 2023

Location

Marker shows the centre of Grand Forks County; the queue data does not give exact sites.

Power plants in North Dakota Β· Transmission lines in North Dakota

Other requests in Grand Forks County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem