ONSHORE WIND Β· MISOOnshore wind project MPC04100, Grand Forks County
Onshore wind project MPC04100, Grand Forks County is a 300 MW onshore wind request withdrawn in the MISO interconnection queue, in Grand Forks County, North Dakota, connecting to Minnkota Power Cooperative.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2019 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- MPC04100
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- Minnkota Power Cooperative
- Connection point (POI)
- Prairie 230 kV
- Location
- Grand Forks County, North Dakota
- Technology
- Wind: 300 MW
- Total requested
- 300 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 25 April 2019
- Proposed online date
- December 2023
Location
Marker shows the centre of Grand Forks County; the queue data does not give exact sites.
Power plants in North Dakota Β· Transmission lines in North Dakota
Other requests in Grand Forks County
- Onshore wind project MPC04500, Grand Forks CountyOnshore wind Β· 258 MW Β· in study
- Onshore wind project MPC04400, Grand Forks CountyOnshore wind Β· 206 MW Β· in study
- Onshore wind project J628, Grand Forks CountyOnshore wind Β· 400 MW Β· withdrawn
- Onshore wind project MPC02300, Grand Forks CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project J897, Grand Forks CountyOnshore wind Β· 190 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem