OCTARY USA · INTERCONNECTION QUEUESInterconnection queue in ERCOT (Texas) (2024 requests) — page 6
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Malachite BESS Solar + storage · Malachite Storage LLC |
191 MW | In study |
| Bullring Wind 3 Onshore wind · Halcon Wind, LLC |
190 MW | Agreement signed |
| Chacon Creek Battery storage · Cattlemen BESS LLC |
189 MW | In study |
| Los Vientos IB Repower Onshore wind · Los Vientos Windpower IB, LLC |
185 MW | In study |
| Malachite Solar Solar + storage · Malachite Solar LLC |
185 MW | In study |
| Cairos Storage 2 Battery storage · Cairos Solar, LLC |
184 MW | In study |
| Jalisco Peaker Gas · HEP Power Generation, LLC |
184 MW | In study |
| Basketflower Solar Solar + storage · Basketflower Solar, LLC |
183 MW | In study |
| Nanulak BESS Battery storage · Nanulak BESS, L.L.C. |
182 MW | In study |
| Turkey Creek Solar SLF Solar + storage · Greenray Solar Corporation |
181 MW | In study |
| Amphion Solar Phase 1 Solar · Amphion Solar, LLC |
181 MW | In study |
| Whitetail BESS Battery storage · Hunt Energy Network, LLC |
180 MW | In study |
| Proteus Thornton Ranch Solar SLF Solar + storage · Thornton Ranch Solar, LLC |
180 MW | In study |
| Saddle Horn Station BESS SLF Solar + storage · Saddle Horn Station BESS LLC |
177 MW | In study |
| Saddle Horn Station Solar SLF Solar + storage · Saddle Horn Station LLC |
175 MW | In study |
| Coastal Bayou Storage Battery storage · TOCE TX BESS 5, LLC |
175 MW | In study |
| Honey Mesquite Wind Farm Onshore wind · Honey Mesquite Wind Farm , LLC |
174 MW | Agreement signed |
| Wagon Timber Solar Solar + storage · Wagon Timber Solar, LLC |
172 MW | In study |
| Sullivan Solar Solar + storage · Sullivan Solar LLC |
171 MW | In study |
| Seven Springs Storage Solar + storage · Hancock Reservoir, LLC |
171 MW | In study |
| Fagus Solar Park 3 SLF Solar + storage · Greenalia Solar Power Misae III, LLC |
170 MW | Agreement signed |
| Buffalo Gap 3 Wind Repower Onshore wind · Buffalo Gap Wind Farm 3, LLC |
169 MW | Agreement signed |
| Donna Solar Solar + storage · Donna Solar LLC |
168 MW | In study |
| Jalisco Cogen Gas · HEP Power Generation, LLC |
168 MW | In study |
| Fagus Solar Park 2 SLF Solar + storage · Excel Advantage Services, LLC dba Misae Solar Park II |
167 MW | Agreement signed |
| Lone Star Industrial Park Gas Power Project Gas · LONE STAR INDUSTRIAL PARK, LLC |
166 MW | In study |
| Dove Creek Solar Solar + storage · Dove Creek Solar, LLC |
164 MW | In study |
| Dove Creek Storage Solar + storage · Dove Creek Solar, LLC |
163 MW | In study |
| Albatross BESS 2 Battery storage · Albatross Solar, LLC |
160 MW | In study |
| Otter BESS Battery storage · GRS BESS TEXAS TEN, LLC |
157 MW | In study |
| Coyote Den Storage Battery storage · Coyote Den Energy Center, LLC |
157 MW | In study |
| Salt-Lick Storage Solar + storage · Salt-Lick Storage, LLC |
155 MW | In study |
| Winters Glow Storage Solar + storage · Winters Glow Storage, LLC |
155 MW | In study |
| Galaxy Storage Solar + storage · Galaxy Solar, LLC |
155 MW | In study |
| Roble BESS Battery storage · Flexen USA LLC |
154 MW | In study |
| Maderagemela BESS1 Battery storage · Twinwood ES1, LLC |
154 MW | In study |
| Pamplona Storage Solar + storage · Karol Solar V |
154 MW | In study |
| Blanco County Behrends Storage Battery storage · DM-BCB, LLC |
154 MW | In study |
| Leon BESS Solar + storage · Leon BESS |
154 MW | In study |
| Wichita County Mawson Storage Battery storage · DM-WCM, LLC |
154 MW | In study |
| Silver Dollar Storage Solar + storage · Silver Dollar Solar Project, LLC |
153 MW | In study |
| Fluvanna Max Solar SLF Solar + storage · Fluvanna Max Solar LLC |
153 MW | In study |
| Palomino Storage Solar + storage · Palomino Renewables |
153 MW | In study |
| Rocky Point BESS Battery storage · Nicole BESS |
151 MW | In study |
| Bluebonnet Trail Solar Solar · Bluebonnet trail solar LLC |
151 MW | In study |
| Pollo Pinto Solar Solar · TX Palo Pinto SB 6, LLC |
151 MW | In study |
| Ulysses Crossing Storage Battery storage |
151 MW | Paused / redesign |
| New Shepherd Solar Solar · New Shepherd Energy Center, LLC |
151 MW | In study |
| Bocanova Power II Battery storage · Bocanova Power II LLC |
151 MW | Agreement signed |
| Dunlay Solar Solar · Medina PV, LLC |
151 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)436 · 104.7 GW
- MISO (Midcontinent)290 · 62.9 GW
- West (non-ISO utilities)192 · 45.5 GW
- Southeast (non-ISO utilities)178 · 35.0 GW
- SPP (Southwest Power Pool)81 · 18.0 GW
- NYISO (New York)89 · 15.6 GW
- ISO-NE (New England)15 · 3,285 MW
- PJM (Mid-Atlantic, Midwest)2 · 95.0 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)