United States βΊ Grid βΊ Interconnection queues
OCTARY USA Β· INTERCONNECTION QUEUESInterconnection queue in ERCOT (Texas) (2022 requests) β page 6
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Ratcliff Solar Solar Β· Greenalia Solar Power Ratcliff |
85.7 MW | In study |
| Hector Solar Solar + storage Β· Hector Solar, LLC |
81.6 MW | In study |
| Blarney Solar Solar Β· Blarney Solar Project LLC |
81.0 MW | Agreement signed |
| Serengeti Solar Solar Β· Abei Energy Green XIV LLC |
76.2 MW | In study |
| PaleAle BESS Battery storage Β· Momentum Energy Storage Partners,LLC |
75.4 MW | In study |
| East Blackland Battery Storage SLF Solar + storage Β· DERIVA ENERGY STORAGE, LLC |
75.0 MW | In study |
| Kildare Solar Β· Galsol, LLC |
70.0 MW | In study |
| Lamar Unit 1 Repower Gas Β· La Frontera Holdings, LLC |
66.0 MW | In study |
| Smith Lake Storage DC Solar + storage Β· Smith Lake Solar |
65.0 MW | In study |
| Demeter Storage Solar + storage Β· Demeter Solar, LLC |
65.0 MW | In study |
| Nymphaea Storage Solar + storage Β· Nymphaea Solar, LLC |
61.0 MW | In study |
| Indigo Storage Solar + storage Β· Innovative Solar 245, LLC |
60.0 MW | In study |
| Longfellow BESS I Solar + storage Β· CENTURY GAS PROCESSING, LLC |
55.0 MW | Agreement signed |
| MRG Goody Storage Solar + storage Β· MRG Goody Solar Project LLC |
52.3 MW | Agreement signed |
| Blanket Ranch North Storage Solar + storage Β· Blanket Ranch North Solar, LLC |
50.9 MW | In study |
| Isaac Solar Solar Β· Industrial Bravo Project LLC |
50.7 MW | Agreement signed |
| Hooper Solar Solar + storage Β· BT Brown Solar, LLC |
50.5 MW | In study |
| Albatross BESS Battery storage Β· Albatross Solar, LLC |
50.4 MW | In study |
| Brightside Solar Alt POI Solar Β· Brightside Solar, LLC |
50.0 MW | Agreement signed |
| Hector Storage Solar + storage Β· Hector Solar, LLC |
42.7 MW | In study |
| Blanket Ranch South Storage Solar + storage Β· Blanket Ranch South Solar, LLC |
34.3 MW | In study |
| Lager Storage Battery storage Β· Momentum Lager LLC |
31.1 MW | In study |
| Hooper Storage Solar + storage Β· BT Brown Solar, LLC |
30.7 MW | In study |
| Pitts Dudik II Solar Β· Pitts Dudik II |
30.2 MW | Agreement signed |
| Kennedy Storage Solar + storage Β· Kennedy Bypass Solar LLC |
25.3 MW | In study |
| Burro Loco Energy Storage Battery storage Β· VESI |
25.1 MW | In study |
| Hays Energy Unit 2 Repower Gas Β· HAYS ENERGY, LLC |
18.0 MW | In study |
| Clutch City Storage I SLF Battery storage |
16.6 MW | Paused / redesign |
| CPS AvR CT1 Rotor Replacement Gas Β· CPS Energy |
11.3 MW | In study |
| Medina City BESS Battery storage Β· Regis Medina, LLC |
10.0 MW | In study |
| Laureles BESS Battery storage Β· Regis Laureles LLC |
9.9 MW | Agreement signed |
| Leakey BESS Battery storage Β· Regis Leaky LLC |
9.9 MW | In study |
| Utopia BESS Battery storage Β· Regis Utopia, LLC |
9.8 MW | Agreement signed |
| Medina Lake BESS Battery storage Β· Regis Medina Lake LLC |
9.8 MW | Agreement signed |
| Giga Austin Solar Solar Β· GIGA TEXAS ENERGY LLC |
-53.3 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)317 Β· 99.9 GW
- MISO (Midcontinent)435 Β· 82.2 GW
- ERCOT (Texas)285 Β· 56.7 GW
- PJM (Mid-Atlantic, Midwest)301 Β· 37.9 GW
- Southeast (non-ISO utilities)142 Β· 17.0 GW
- SPP (Southwest Power Pool)25 Β· 4,717 MW
- ISO-NE (New England)8 Β· 1,031 MW
- NYISO (New York)1 Β· 20.0 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)