OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in CAISO (California) — page 5
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Copper Mountain Project Gas |
634 MW | Withdrawn / abandoned |
| Bluff Trail Storage Battery storage |
632 MW | Withdrawn / abandoned |
| Salton Solar Solar + storage |
632 MW | Withdrawn / abandoned |
| CPV California Ix Gas |
630 MW | Withdrawn / abandoned |
| CPV California Viii Gas |
630 MW | Withdrawn / abandoned |
| CPV California Vii Gas |
630 MW | Withdrawn / abandoned |
| CPV California VI Gas |
630 MW | Withdrawn / abandoned |
| Seaglass Offshore Wind Offshore wind |
629 MW | Withdrawn / abandoned |
| Pecho Energy Storage Other |
628 MW | Withdrawn / abandoned |
| Lion Rock Offshore Wind Offshore wind |
627 MW | Withdrawn / abandoned |
| Belmont Solar + storage |
627 MW | Withdrawn / abandoned |
| Birch Street Generation Facility (Fka Birch Street- Simple Cycle) Gas |
625 MW | Withdrawn / abandoned |
| Grand Ave Generation Facility (Fka Grand Ave Simple Cycle) Gas |
625 MW | Withdrawn / abandoned |
| Natura Other |
623 MW | Withdrawn / abandoned |
| Ventoso Other |
623 MW | Withdrawn / abandoned |
| Date Palm Battery storage |
621 MW | Withdrawn / abandoned |
| Avenal Energy Project Gas |
620 MW | Withdrawn / abandoned |
| Rainbow Energy Facility Gas |
620 MW | Withdrawn / abandoned |
| Astra Other |
620 MW | Withdrawn / abandoned |
| Fortuna Other |
620 MW | Withdrawn / abandoned |
| Valorem Other |
619 MW | Withdrawn / abandoned |
| Fort Tejon Solar Solar + storage |
617 MW | Withdrawn / abandoned |
| Fortis Other |
616 MW | Withdrawn / abandoned |
| Charger Storage Battery storage |
616 MW | Withdrawn / abandoned |
| Blue Oak Storage Battery storage |
616 MW | Withdrawn / abandoned |
| Resonate Solar + storage |
615 MW | Withdrawn / abandoned |
| Angel Energy Center Battery storage |
615 MW | Withdrawn / abandoned |
| Porta Other |
615 MW | Withdrawn / abandoned |
| Waller Solar Farm Solar + storage |
615 MW | Withdrawn / abandoned |
| Carson Hydrogen Power Project (CHPP) Gas |
614 MW | Withdrawn / abandoned |
| Papago Solar + storage |
613 MW | Withdrawn / abandoned |
| Osito Energy Solar + storage |
613 MW | Withdrawn / abandoned |
| Voltron Solar + storage |
612 MW | Withdrawn / abandoned |
| Mojave Solar Park 4 - Johnson Valley Solar |
612 MW | Withdrawn / abandoned |
| Marsh Landing Generating Station - Combined Cycle Units Gas |
611 MW | Withdrawn / abandoned |
| Pittsburg Power Plant - Ccu Gas |
611 MW | Withdrawn / abandoned |
| Venado Valley 1 Solar + storage |
610 MW | Withdrawn / abandoned |
| Vernon Power Plant Gas |
610 MW | Withdrawn / abandoned |
| Canella Solar Farm Solar + storage |
610 MW | Withdrawn / abandoned |
| Blue Oak Storage 2 Battery storage |
609 MW | Withdrawn / abandoned |
| Red Arch Hybrid Solar Solar + storage |
608 MW | Withdrawn / abandoned |
| Europa Energy Center Solar + storage |
607 MW | Withdrawn / abandoned |
| Panache Solar Solar + storage |
606 MW | Withdrawn / abandoned |
| Great Dane Solar Solar + storage |
601 MW | Withdrawn / abandoned |
| La Paloma II Gas |
600 MW | Withdrawn / abandoned |
| Cadiz East Solar |
600 MW | Withdrawn / abandoned |
| Sutter Energy Center Gas |
600 MW | Withdrawn / abandoned |
| Sutter Energy Center 2 Gas |
600 MW | Withdrawn / abandoned |
| East Altamont Energy Center Gas |
600 MW | Withdrawn / abandoned |
| Meteorite Solar Solar + storage |
600 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)