United States › Grid › Interconnection queues › California

GAS · CAISO

Carson Hydrogen Power Project (CHPP)

Carson Hydrogen Power Project (CHPP) is a 614 MW gas request withdrawn in the CAISO interconnection queue, in Los Angeles County, California, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2006 (completed)
  2. Withdrawn / abandonedFeb 2008 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
88
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
Hinson Sub 230 kV bus
Location
Los Angeles County, California
Technology
Gas: 614 MW
Total requested
614 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
10 February 2006
Proposed online date
July 2011
Withdrawn
February 2008

Location

Marker shows the centre of Los Angeles County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Los Angeles County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem