United States β€Ί Grid β€Ί Interconnection queues β€Ί Nevada

GAS Β· CAISO

Copper Mountain Project

Copper Mountain Project is a 634 MW gas request withdrawn in the CAISO interconnection queue, in Clark County, Nevada, connecting to SCE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2005 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
56
Grid region
CAISO (California)
Utility / transmission owner
SCE
Connection point (POI)
El Dorado 230 kV Substation
Location
Clark County, Nevada
Technology
Gas: 634 MW
Total requested
634 MW
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
25 January 2005
Proposed online date
August 2009

Location

Marker shows the centre of Clark County; the queue data does not give exact sites.

Power plants in Nevada Β· Transmission lines in Nevada

Other requests in Clark County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem