Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown23437.6 GW
Active in queue188.6 GW429 requests
Agreement signed96.2 GW235 requests
Withdrawn2,186619.9 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

234 requests · page 5 of 5
ProjectCapacityStatusLocationRegionQueuedOnline
Westlands Almond
Solar
19.9 MWOperating Kings, CACAISO Apr 20152023
White River 2 (Fka:White River West 19.75 MW PV Generation Facilty)
Solar
19.8 MWOperating Tulare, CACAISO Feb 20102014
Corcoran 2 Generating Facility (Fka: Corcoran West 19.75 MW PV Generation Facilty)
Solar
19.8 MWOperating Kings, CACAISO Feb 20102015
Adams East
Solar
19.0 MWOperating Fresno, CACAISO May 20102014
BVBP Repowering Project
Other
18.4 MWOperating Amador, CACAISO Apr 20092012
Westlands Solar Farm PV1
Solar
18.0 MWOperating Fresno, CACAISO Jun 20102014
Pio Pico Plus
Gas
18.0 MWOperating CACAISO Feb 20172017
Morelos Del Sol (Fka Twissleman I)
Solar
15.0 MWOperating Kern, CACAISO Mar 20112015
Wildwood Solar 2
Solar
15.0 MWOperating Kern, CACAISO Apr 20122017
Java Solar
Solar
13.5 MWOperating Kings, CACAISO Apr 20132022
Bear Canyon Energy Storage
Battery storage
13.3 MWOperating Lake, CACAISO Apr 20152024
Ox Mountain Landfill Gas Generation
Gas
12.6 MWOperating San Mateo, CACAISO Jun 20052009
Blue Lake Power
Other
11.0 MWOperating CACAISO Aug 20082010
Spi Sonora
Other
10.9 MWOperating Tuolumne, CACAISO May 20162018
Chowchilla Biomass
Other
10.5 MWOperating Madera, CACAISO Jul 20052009
El Nido
Other
10.5 MWOperating Merced, CACAISO Jul 20052009
Pio Pico Capacity Increase (Fka Pio Pico Energy Center 2)
Gas
10.0 MWOperating San Diego, CACAISO Apr 20142016
Western Antelope DRY Ranch
Solar
10.0 MWOperating Los Angeles, CACAISO Oct 20102016
Ultrapower Chinese Station BESS
Battery storage
10.0 MWOperating Tuolumne, CACAISO Apr 2015target 2017
Skic Solar
Solar
10.0 MWOperating Kern, CACAISO Apr 20122017
Terra-Gen Dixie Valley Expansion (Fka Caithness Dixie Valley)
Geothermal
10.0 MWOperating Churchill, NVCAISO Jul 20042006
Pearblossom Solar
Solar
9.5 MWOperating Los Angeles, CACAISO Apr 20132016
Tulloch Powerhouse
Hydro
7.2 MWOperating Tuolumne, CACAISO Jul 20092012
Wind Wall Monolith 1
Onshore wind
5.0 MWOperating CACAISO Apr 20182021
Calrenew-1(A)
Solar
5.0 MWOperating Fresno, CACAISO Oct 20072010
Re Garland
Solar
5.0 MWOperating Kern, CACAISO May 20202021
Ameresco Butte County Landfill
Other
4.0 MWOperating Butte, CACAISO Feb 20092012
Wind Wall Monolith 2
Onshore wind
3.7 MWOperating Kern, CACAISO Apr 20182021
Vasco Wind Project
Onshore wind
3.1 MWOperating Contra Costa, CACAISO Mar 20112011
Chula Vista Energy Center Expansion
Gas
2.8 MWOperating San Diego, CACAISO Mar 20212022
Point Wind Fast Track
Onshore wind
1.6 MWOperating Kern, CACAISO Apr 20202021
Fresno Cogen Ice Unit
Gas
0.6 MWOperating Fresno, CACAISO Dec 20042006
Merced Power
Other
0.5 MWOperating Merced, CACAISO Mar 20142014
Richmond Steam Turbine
Gas
0.0 MWOperating Contra Costa, CACAISO Apr 20142019
Page 5 of 5

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)