United States โบ Grid โบ Interconnection queues
OCTARY USA ยท INTERCONNECTION QUEUESQueue requests in study in the USA (2023 requests) โ page 4
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Onshore wind project Q538, Coconino County Onshore wind |
500 MW | In study |
| Cantus Solar + storage |
499 MW | In study |
| Battery storage project G0941, Gilliam County Battery storage |
488 MW | In study |
| Gas project GEN-2023-222, Gage County Gas |
478 MW | In study |
| Gas project GEN-2023-224, Lancaster County Gas |
478 MW | In study |
| Solar + storage project GEN-2023-102, Woods County Solar + storage |
475 MW | In study |
| Shoals Energy Storage 2 Battery storage |
461 MW | In study |
| Solar + storage project Company 218, Clark County Solar + storage |
460 MW | Paused / redesign |
| Salt-Lick Solar Solar + storage ยท Salt-Lick Solar, LLC |
453 MW | In study |
| TRIFECTA Gas Gas ยท NET Power |
453 MW | In study |
| Gas project 2023-G13, La Paz County Gas |
453 MW | In study |
| Solar + storage project Company OF, Lander County Solar + storage |
450 MW | Paused / redesign |
| Aurelius 2 Solar Solar ยท IP Roman, LLC |
445 MW | In study |
| Aurelius 3 Solar Solar ยท IP Roman III, LLC |
445 MW | In study |
| Gas project Q40, Maricopa County Gas |
425 MW | In study |
| Solar + storage project G0844, Klickitat County Solar + storage |
420 MW | In study |
| Whiskey Diggings Solar |
414 MW | In study |
| Western Flats Solar Solar + storage ยท Hecate Energy Point Mountain Solar Facility 1 LLC |
410 MW | In study |
| Silverton Solar Solar ยท NextEra Energy Interconnection Holdings, LLC |
410 MW | In study |
| Solstice C Solar + storage |
408 MW | In study |
| Solstice D Solar + storage |
408 MW | In study |
| Lund Storage Center 1 Battery storage ยท Lund Storage Center 1, LLC |
408 MW | In study |
| Maravillosa 1 Solar + storage |
407 MW | In study |
| Claire BESS Battery storage ยท BRP Blue Topaz 3, LLC |
406 MW | In study |
| Tea Leaf Energy Storage Battery storage |
404 MW | In study |
| Gas project IC-1160, Shelby County Gas |
403 MW | Paused / redesign |
| Gas project IC-1159, Shelby County Gas |
403 MW | Paused / redesign |
| Solar project G1035, Douglas County Solar |
400 MW | In study |
| Solar + storage project Q537, Pinal County Solar + storage |
400 MW | In study |
| Onshore wind project GI-2023-14, Morgan County Onshore wind |
400 MW | Paused / redesign |
| Gamay Solar + storage |
400 MW | In study |
| Battery storage project 23-221, Washington County Battery storage |
400 MW | In study |
| Other project G0895, Linn County Other |
400 MW | In study |
| Other project G0893, Linn County Other |
400 MW | In study |
| Solar + storage project G0887, Douglas County Solar + storage |
400 MW | In study |
| Solar + storage project G0979, Klickitat County Solar + storage |
400 MW | In study |
| Solar + storage project G0901, Linn County Solar + storage |
400 MW | In study |
| Solar project G1016, Klickitat County Solar |
400 MW | In study |
| Solar + storage project Q507, Maricopa County Solar + storage |
400 MW | In study |
| Solar + storage project G0888, Lane County Solar + storage |
400 MW | In study |
| Solar + storage project G0900, Linn County Solar + storage |
400 MW | In study |
| Solar + storage project G0910, Deschutes County Solar + storage |
400 MW | In study |
| Other project G0904, Linn County Other |
400 MW | In study |
| Solar + storage project C3-041, Harney County Solar + storage ยท Lone Pine Energy, LLC |
400 MW | Paused / redesign |
| Other project G0899, Linn County Other |
400 MW | In study |
| Other project G0902, Linn County Other |
400 MW | In study |
| Boling Generation (TEF-Due Diligience) Gas ยท Boling Generation |
400 MW | In study |
| Solar + storage project G0912, Deschutes County Solar + storage |
400 MW | In study |
| Other project G0905, Linn County Other |
400 MW | In study |
| Other project G0894, Linn County Other |
400 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)291 ยท 107.5 GW
- CAISO (California)107 ยท 53.4 GW
- ERCOT (Texas)253 ยท 51.8 GW
- Southeast (non-ISO utilities)157 ยท 17.0 GW
- PJM (Mid-Atlantic, Midwest)156 ยท 14.6 GW
- SPP (Southwest Power Pool)73 ยท 14.1 GW
- MISO (Midcontinent)22 ยท 3,354 MW
- ISO-NE (New England)6 ยท 1,053 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines ยท Planned power plants (EIA)