United States › Grid › Interconnection queues › Texas
OCTARY USA · INTERCONNECTION QUEUESInterconnection queue in Texas (2025 requests) — page 4
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Pease River Solar Solar · Pease River Solar LLC |
276 MW | In study |
| Roboman Solar Solar · Roboman Solar, LLC |
273 MW | In study |
| Velociraptor BESS II Solar + storage · Greyhound BESS 3 LLC |
261 MW | In study |
| Velociraptor BESS I Solar + storage · Greyhound BESS 2 LLC |
261 MW | In study |
| Jay Flat BESS Battery storage · Jay Flat BESS LLC |
259 MW | In study |
| Horsepower BESS Battery storage · Horsepower BESS, LLC |
258 MW | In study |
| San Gabriel Solar Solar + storage · San Gabriel Solar LLC |
255 MW | In study |
| Clairemont Solar 1 Solar · Clairemont Solar LLC |
252 MW | Agreement signed |
| Velociraptor Solar II Solar + storage · Greyhound Solar 3 LLC |
252 MW | In study |
| Paint Brush PV2 Solar · Renew Development HoldCo LLC |
252 MW | In study |
| Paint Brush PV3 Solar · Renew Development HoldCo LLC |
252 MW | In study |
| Cowboy Power Gas Plant Gas · Vaquero Power, LLC |
252 MW | In study |
| Paint Brush PV4 Solar · Renew Development HoldCo LLC |
252 MW | In study |
| Paint Brush PV1 Solar · Renew Development HoldCo LLC |
252 MW | In study |
| Althea Storage Battery storage · Sugaree Solar LLC |
251 MW | Agreement signed |
| Oak Valley Solar Solar · Oak Valley Solar LLC |
251 MW | In study |
| Wake Wind Energy Onshore wind · WAKE WIND ENERGY |
251 MW | In study |
| Alkali Creek Wind 2 Onshore wind · Alkali Creek Wind, LLC |
250 MW | In study |
| Ca-CO-250B Battery storage |
250 MW | In study |
| Solar project GEN-2024-232, Houston County Solar |
250 MW | In study |
| Solar project GEN-2024-153, Randall County Solar |
250 MW | In study |
| Battery storage project GEN-2024-368, Gray County Battery storage |
250 MW | In study |
| Onshore wind project GEN-2024-145, Dallam County Onshore wind |
250 MW | In study |
| Onshore wind project GEN-2024-143, Dallam County Onshore wind |
250 MW | In study |
| Battery storage project ERAS-2025-027, Yoakum County Battery storage |
250 MW | In study |
| Bluewind BESS Battery storage · Bluewind Energy Center, LLC |
247 MW | In study |
| Mojo BESS Solar + storage · Power Synergy |
246 MW | In study |
| Apricot Sun Solar Solar + storage · Apricot Sun Energy Center, LLC |
246 MW | In study |
| Dempsey Solar SLF Solar + storage · Dempsey Solar LLC |
245 MW | In study |
| Brazos Bend Solar SLF Solar + storage · Grenergy USA |
243 MW | In study |
| Brazos Bend Storage SLF Solar + storage · Grenergy USA |
243 MW | In study |
| Kuy Creek Solar 1 SLF Solar + storage · Kuy Creek Solar 1 LLC |
235 MW | In study |
| Gas project ERAS-2025-016, Lamb County Gas |
233 MW | In study |
| Cricket Storage Battery storage · Cricket Storage, LLC |
232 MW | In study |
| Allthorn Solar Solar + storage · ALLTHORN SOLAR, LLC |
232 MW | In study |
| Sim Gideon Gas Rice Gas · LCRA |
226 MW | In study |
| Tolivar Power Plant Phase 2 Gas · Pecos Power Plant, LLC |
225 MW | In study |
| Grayback Solar Solar · Grayback Solar, LLC |
222 MW | In study |
| Miracle Ranch Solar SLF Solar + storage · Miracle Ranch LLC |
222 MW | In study |
| Gas project ERAS-2025-002, Hale County Gas |
217 MW | In study |
| Diamond Sage Solar 1 Solar + storage · DGC Renewables, LLC |
214 MW | In study |
| Diamond Sage Solar 2 Solar + storage · DGC Renewables, LLC |
214 MW | In study |
| Mesquite Creek Windpower Repower Onshore wind · Mesquite Creek Wind LLC |
213 MW | In study |
| Gypsum Plains Storage Solar + storage · Gypsum Plains Solar, LLC |
211 MW | In study |
| Treehouse Storage Solar + storage · Treehouse Solar, LLC |
209 MW | In study |
| Gulf Prairie BESS Solar + storage · Gulf Prairie Energy LLC |
208 MW | In study |
| Metro BESS Battery storage · Metro BESS LLC |
207 MW | In study |
| Oak Belt Storage Solar + storage · Oak Belt Storage, LLC |
207 MW | In study |
| Zunkerville BESS Solar + storage · Zunkerville Energy, LLC |
207 MW | In study |
| Wolfram Storage Battery storage · Nova Clean Energy, LLC |
207 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)358 · 104.0 GW
- SPP (Southwest Power Pool)33 · 9,266 MW
- MISO (Midcontinent)6 · 2,017 MW
- West (non-ISO utilities)5 · 997 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)