United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESWithdrawn queue requests in CAISO (California) — page 38
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Weber Grid Stabilization Project Battery storage |
25.0 MW | Withdrawn / abandoned |
| Apparent First Hybrid Solar + storage |
24.1 MW | Withdrawn / abandoned |
| Medeiros BESS Battery storage |
23.0 MW | Withdrawn / abandoned |
| Helm 1 Solar |
23.0 MW | Withdrawn / abandoned |
| Luna Mar Battery storage |
23.0 MW | Withdrawn / abandoned |
| Atwell West BESS Addition Solar + storage |
23.0 MW | Withdrawn / abandoned |
| PV-03 Expansion Solar |
23.0 MW | Withdrawn / abandoned |
| Corcoran 2 BESS Addition Solar + storage |
22.8 MW | Withdrawn / abandoned |
| Helios Prime Solar |
22.4 MW | Withdrawn / abandoned |
| Redtail Energy Storage Battery storage |
22.2 MW | Withdrawn / abandoned |
| PV-11 Expansion Solar |
22.0 MW | Withdrawn / abandoned |
| Crow Creek Battery 1 Battery storage |
21.8 MW | Withdrawn / abandoned |
| Britain Solar |
21.7 MW | Withdrawn / abandoned |
| Trafalgar Solar |
21.7 MW | Withdrawn / abandoned |
| Sanborn II Solar Solar |
21.0 MW | Withdrawn / abandoned |
| Wild Sands Solar Solar |
21.0 MW | Withdrawn / abandoned |
| Panem Solar Solar |
20.9 MW | Withdrawn / abandoned |
| Ampchamp Storage Battery storage |
20.8 MW | Withdrawn / abandoned |
| Niles Solar 1 Solar |
20.5 MW | Withdrawn / abandoned |
| Wolverine Solar 1 - Fka Yuba Solar 1 Solar |
20.5 MW | Withdrawn / abandoned |
| Ee K Battery 1 Battery storage |
20.4 MW | Withdrawn / abandoned |
| Riosa Central Solar Solar |
20.2 MW | Withdrawn / abandoned |
| Plainfield Solar Solar |
20.0 MW | Withdrawn / abandoned |
| Big Potrero Solar |
20.0 MW | Withdrawn / abandoned |
| Skunk Hollow SPGS1 Solar |
20.0 MW | Withdrawn / abandoned |
| Cooley Landing BESS Battery storage |
20.0 MW | Withdrawn / abandoned |
| Las Lomas Solar Solar |
20.0 MW | Withdrawn / abandoned |
| FRV Orion Solar Solar |
20.0 MW | Withdrawn / abandoned |
| Kingsolar (Fka Quay Valley 20MW Solar PV) Solar |
20.0 MW | Withdrawn / abandoned |
| High Noon Solar |
20.0 MW | Withdrawn / abandoned |
| Stingray Energy Storage Battery storage |
20.0 MW | Withdrawn / abandoned |
| Blue Diamond Solar Solar |
20.0 MW | Withdrawn / abandoned |
| Arco Solar 1 Project Solar |
20.0 MW | Withdrawn / abandoned |
| Oasis Solar Energy Solar |
20.0 MW | Withdrawn / abandoned |
| San Joaquin 2A Solar |
20.0 MW | Withdrawn / abandoned |
| Honey Lake Geothermal Project Geothermal |
20.0 MW | Withdrawn / abandoned |
| Graham Solar Farm II Solar |
20.0 MW | Withdrawn / abandoned |
| Orion Solar |
20.0 MW | Withdrawn / abandoned |
| Mesa Rojo Solar |
20.0 MW | Withdrawn / abandoned |
| Sun Harvester Solar Project Solar |
20.0 MW | Withdrawn / abandoned |
| Cal SP Xii Solar |
20.0 MW | Withdrawn / abandoned |
| Re Willow Springs Solar |
20.0 MW | Withdrawn / abandoned |
| Re Goldtown Solar |
20.0 MW | Withdrawn / abandoned |
| Timba Solar Solar |
20.0 MW | Withdrawn / abandoned |
| Schindler South Solar Solar |
20.0 MW | Withdrawn / abandoned |
| Waterloo Solar |
20.0 MW | Withdrawn / abandoned |
| Hudson Solar Solar |
20.0 MW | Withdrawn / abandoned |
| Yolo Solar PV I Solar |
20.0 MW | Withdrawn / abandoned |
| Pleasant Grove Grid Stabilization Project Battery storage |
20.0 MW | Withdrawn / abandoned |
| Bfo PV-18 Solar |
20.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)