Atwell West BESS Addition

Atwell West BESS Addition is a 23.0 MW solar + storage request withdrawn in the CAISO interconnection queue, in Tulare County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2015 (completed)
  2. Withdrawn / abandonedMay 2017 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1146
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Olive switching station - Smynra 115 Kv Line
Location
Tulare County, California
Technology
Solar: 20.0 MW · Battery: 3.0 MW
Total requested
23.0 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
30 April 2015
Proposed online date
December 2019
Withdrawn
May 2017

Location

Marker shows the centre of Tulare County; the queue data does not give exact sites.