United States βΊ Grid βΊ Interconnection queues βΊ California
SOLAR Β· CAISOOasis Solar Energy
Oasis Solar Energy is a 20.0 MW solar request withdrawn in the CAISO interconnection queue, in Mono County, California, connecting to SCE.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2010 (completed)
- Withdrawn / abandonedJun 2010 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 617C
- Grid region
- CAISO (California)
- Utility / transmission owner
- SCE
- Connection point (POI)
- Control-Silverpeak 55 kV
- Location
- Mono County, California
- Technology
- Solar: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 31 March 2010
- Proposed online date
- December 2012
- Withdrawn
- June 2010
Location
Marker shows the centre of Mono County; the queue data does not give exact sites.
Power plants in California Β· Transmission lines in California
Other requests in Mono County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem