Interconnection queue in the USA (2025 requests) β€” page 37

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown1,836452.0 GW
Active in queue452.0 GW1,836 requests
Agreement signed4,701 MW27 requests
Withdrawn47497.1 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

1,836 requests Β· page 37 of 37
ProjectCapacityStatusLocationRegionQueuedOnline
Solar project 977864, Florence County
Solar
5.0 MWIn study Florence, SCSoutheast Jun 2025
Gas project PP00022, Wayne County
Gas
5.0 MWIn study Wayne, NCSoutheast Apr 2025target 2028
Solar project 977888, Rockingham County
Solar
5.0 MWIn study Rockingham, NCSoutheast Jun 2025
Solar project 977879, Florence County
Solar
5.0 MWIn study Florence, SCSoutheast Jun 2025
Gas project PP00023, Wayne County
Gas
5.0 MWIn study Wayne, NCSoutheast Apr 2025target 2029
Solar project 968459, Darlington County
Solar
5.0 MWIn study Darlington, SCSoutheast Jan 2025
Gas project PP00019, Buncombe County
Gas
5.0 MWIn study Buncombe, NCSoutheast Apr 2025target 2026
Solar project 977889, Scotland County
Solar
5.0 MWIn study Scotland, NCSoutheast Jun 2025
Solar project 977892, Warren County
Solar
5.0 MWIn study Warren, NCSoutheast Jun 2025
Gas project AH1-567, Will County
Gas Β· University Park Energy, LLC
5.0 MWIn study Will, ILPJM Mar 2025target 2025
Gas project PP00020, Buncombe County
Gas
5.0 MWIn study Buncombe, NCSoutheast Apr 2025target 2027
Solar project AG2-037, Allegheny County
Solar Β· PG Solar LLC
4.7 MWIn study Allegheny, PAPJM Feb 2025target 2021
Battery storage project 976447, Mecklenburg County
Battery storage
4.1 MWIn study Mecklenburg, NCSoutheast Jun 2025
Solar project 968543, Dillon County
Solar
4.0 MWIn study Dillon, SCSoutheast Jan 2025
Solar project 977896, Cleveland County
Solar
4.0 MWIn study Cleveland, NCSoutheast Jun 2025
Geothermal project T2-012, Beaver County
Geothermal
3.6 MWIn study Beaver, UTWest Aug 2025target 2025
Roadrunner Crossing Wind (Uprate)
Wind + storage Β· Roadrunner Wind, LLC
3.3 MWIn study Eastland, TXERCOT Dec 2025target 2026
Solar project 977878, Marion County
Solar
3.2 MWIn study Marion, SCSoutheast Jun 2025
Battery storage project 977422, Pender County
Battery storage
3.1 MWIn study Pender, NCSoutheast Jun 2025
Solar project 968482, Anderson County
Solar
3.0 MWIn study Anderson, SCSoutheast Jan 2025
Solar project 972410, Anderson County
Solar
2.5 MWIn study Anderson, SCSoutheast Mar 2025
Solar project 966893, Spartanburg County
Solar
2.5 MWIn study Spartanburg, SCSoutheast Jan 2025
Solar project 968499, Greenwood County
Solar
2.0 MWIn study Greenwood, SCSoutheast Jan 2025
Ashra Storage SLF
Solar + storage Β· Ashra Solar, LLC
1.6 MWIn study Uvalde, TXERCOT Apr 2025target 2028
Solar project 977127, Anderson County
Solar
1.5 MWIn study Anderson, SCSoutheast Jun 2025
Hydro project 977636, Anson County
Hydro
1.5 MWIn study Anson, NCSoutheast Jun 2025
Kickstart Energy Storage IV
Battery storage Β· Kickstart Infrastructure LLC
1.4 MWIn study Ellis, TXERCOT Mar 2025target 2029
Kickstart Energy Storage III
Battery storage Β· Kickstart Infrastructure LLC
1.4 MWIn study Ellis, TXERCOT Mar 2025target 2029
Kickstart Energy Storage I
Battery storage Β· Kickstart Infrastructure LLC
1.4 MWIn study Ellis, TXERCOT Mar 2025target 2029
Kickstart Energy Storage II
Battery storage Β· Kickstart Infrastructure LLC
1.4 MWIn study Ellis, TXERCOT Mar 2025target 2029
Solar project G1075, Lane County
Solar
1.1 MWIn study Lane, ORWest Mar 2025target 2025
Solar project G1077, Lane County
Solar
0.4 MWIn study Lane, ORWest Apr 2025target 2025
Solar project T2-089, Deschutes County
Solar
0.4 MWIn study Deschutes, ORWest Sep 2025
Battery storage project G1085, Flathead County
Battery storage
0.3 MWIn study Flathead, MTWest Aug 2025target 2025
Hydro project 755, Gem County
Hydro Β· Emmett Main Canal
0.1 MWAgreement signed Gem, IDWest Jan 2025target 2026
Onshore wind project GEN-2025-GR3, Mclean County
Onshore wind
0.0 MWIn study Mclean, NDSPP Oct 2025
Page 37 of 37

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)