United States › Grid › Interconnection queues › North Carolina
SOLAR · SOUTHEASTSolar project 977892, Warren County
Solar project 977892, Warren County is a 5.0 MW solar request in interconnection study in the Southeast interconnection queue, in Warren County, North Carolina, connecting to Duke Energy Progress.
- PlanningQueued Jun 2025 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- Operating (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 977892
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Progress
- Connection point (POI)
- WARRENTON 115KV
- Location
- Warren County, North Carolina
- Technology
- Solar: 5.0 MW
- Total requested
- 5.0 MW
- Service type
- Other
- Study phase
- Phase 1 Cluster Study - Study Complete
- Queue status
- Active
- Entered queue
- 30 June 2025
Location
Marker shows the centre of Warren County; the queue data does not give exact sites.
Power plants in North Carolina · Transmission lines in North Carolina
Other requests in Warren County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem